Forum Discussion
Remove Group from Project
- Nov 18, 2022
Hello mylogi88 ,
Unfortunately there isn't a way to remove the Group once linked to a project. If you want to link this project to another group, one option will be to use the Copy Project feature:
That will create a copy of the current project, with the newly created project, you can link that to the correct group. Then delete the original project if needed?
Paul
mylogi88 - It's possible to remove but has it limits depending upon whether the project was created in the default environment or in a named instance using the Project Accelerator.
- Project Accelerator - Open the project, go to Summary form and remove the group from the Owner field then click Save. This works form both M365 and Teams groups. After removal everyone loses access to the project until you create/reassign another group and you'll have to manually add the users back to the new group. Currently you can't assign a group directly to the Owner field, only Users. You have to go to Task Grid then Group Members and create or reassign a group.
- Default environment - If it's an M365 group, not a Teams group, you can delete it, but ensure you understand the impact if the group is used elsewhere.
Technically you can delete a Teams groups, but I wouldn't recommend it as you will lose access to the Team.
RodFromm Could you please add screen dump as I can't find project summary and owner you mentioned. Thank you.
- RodFrommFeb 16, 2024Steel Contributor
Qingfen Lin
In our testing after removing the group from the Owner field it can take up to 2 hours before you can create/assign another group to the project. You must create/assign the group in the Task Grid Group Member area as the Owner field only allows you to assign users and not groups.