Project Web App (Project Online) Connectivity to Power BI through OData
I am trying to connect my Project plan which is in Project online (PWA) to Power BI through OData for custom PBI reporting of Project plan. I can get all the table's for PBI Visualisation. I am u...
Karl STEWING
May 10, 2018Copper Contributor
Hello -
There is no direct link that can be established between Resources and Tasks. You could use the Assignments table to do that (to see resource assignments against tasks).
- Madan kumarMay 10, 2018Copper Contributor
Hi Karl,
Thanks for your reply, I did tried i can now bring in the resources through Assignment table but i am unable to see the user specific tasks on my report.
There is a relationship between two table Assignment table and Task Table (Unique Value is Task Id)
E.g. Task 1 is assigned to User A, Task 2 to User B and Task 3 to User C, When the select User A it still shows me all the tasks. I have to see Task 1 as per my filter selection.
- Ian BrucknerMay 10, 2018Iron Contributor
Have you linked assignments to resources on ResourceId yet?
- Madan kumarMay 10, 2018Copper Contributor
Yes I Did, There is a relationship between the two tables