Project OData table not updating

Hope someone can assist me here.
I'm attempting to set up a PowerBI report for Project Online data. When I connect to the OData feed for my pwa site, the tables returned don't have up to date data in them.
Example, we have a Risks table that when I look in the actual SharePoint list, I see a dozen items. However when I look at the table returned via OData I only see 2 items and they are items that were deleted days ago.
Is there some type of timer job that has to run on the backend to update those tables, or should the OData connection show exactly what the list shows at that exact moment?

1 Reply

  • AysegulAS's avatar
    AysegulAS
    Copper Contributor
    I have the same problem with the Projects data. Even though I changed the type of a project, I see the old version in the data that comes with OData feed. I can not solve it.