Forum Discussion
Chuck_Pollard
Jul 28, 2023Brass Contributor
Project; Bugs, Problems, and Issues - Table Rows
 Can anyone help me figure out why (only sometimes) the rows on my table gently fade away into nothing?  The photo below shows it happening in one band sometimes it happens in two or three bands.  Ini...
John-project
Jul 28, 2023Silver Contributor
Like Dale, I've never seen this type of problem but then I never mess with Gridlines either.
However, I notice something interesting on your screen shot of the Gridline settings. Even though the interval is set to "none", there is still a line type shown. It should look like this (i.e. no line type where shown)
I suggest you try this.
1. Select an interval other than "none".
2. Set the line type to be blank
3. Set the interval back to "none"
4. Hit "OK"
Does that clear the problem? It doesn't explain how or why but maybe it gives you an out.
John