Project 2016 freeze after using it for 15 minutes
Hi and thanks in advance My project 2016 freeze after 15 minutes of using it. It freezes for 15 -20 minutes then OK. It's on win 11 64 bit. Same issue was on win 10 64 bits. My laptop is I7 2.8Ghz, ...
gilia1
Dec 12, 2022Copper Contributor
Hey,
Before working wired instead of wireless (that's what made the internet difference)
I updated BIOS with ASUS support >
Updated office + windows >
Uninstalled + Reinstalled Project because I wasn't sure it was 32 / 64 bit as my laptop is 64 bit >
My version is MSP 2016 and MS support advised me to check - "disable hardware graphics acceleration" - in project > file > options > advanced > display area. It's a feature in Office 2016 that it is better to disable for a better performances.
Maybe it would help ...
Gili
Before working wired instead of wireless (that's what made the internet difference)
I updated BIOS with ASUS support >
Updated office + windows >
Uninstalled + Reinstalled Project because I wasn't sure it was 32 / 64 bit as my laptop is 64 bit >
My version is MSP 2016 and MS support advised me to check - "disable hardware graphics acceleration" - in project > file > options > advanced > display area. It's a feature in Office 2016 that it is better to disable for a better performances.
Maybe it would help ...
Gili
John-project
Dec 12, 2022Silver Contributor
Gili,
Okay, thanks for updating with details.
John
Okay, thanks for updating with details.
John