Problems with Microsoft Project office 365 Visual reports MSOLAP$cubes
Problems with Microsoft Project office 365 Visual reports MSOLAP$cubes Hi We have some problems with our Microsoft Project while trying to generate a Visual report: When we check the e...
Dec 30, 2021
Jeremy --
Ever since the Visual Reports feature was added in Microsoft Project 2007 (if memory serves me correctly), I have found this feature to be a bit flaky. If I had one US dollar for every time I have seen that "An unknown error has occurred" error dialog, I would be a wealthy man. 🙂
Whenever I see that error message, I simply try generating the Visual Report again until it finally works. I am not aware of any permanent fix to the problem. Sometimes I am able to generate the Visual Report on the first try, and sometimes I have to try again and again until it finally works.
What happens if you try generating the Visual Report multiple times? Do you eventually succeed? Or is the process failing every time? And if it fails every time, is the problem limited to specific projects or to all projects? Please let us know and we will try to help you.
Ever since the Visual Reports feature was added in Microsoft Project 2007 (if memory serves me correctly), I have found this feature to be a bit flaky. If I had one US dollar for every time I have seen that "An unknown error has occurred" error dialog, I would be a wealthy man. 🙂
Whenever I see that error message, I simply try generating the Visual Report again until it finally works. I am not aware of any permanent fix to the problem. Sometimes I am able to generate the Visual Report on the first try, and sometimes I have to try again and again until it finally works.
What happens if you try generating the Visual Report multiple times? Do you eventually succeed? Or is the process failing every time? And if it fails every time, is the problem limited to specific projects or to all projects? Please let us know and we will try to help you.
Jeremy9251970
Dec 30, 2021Copper Contributor
Hi
Thanks for the help :).
I tried to generate the visual report a couple of times but it keeps failing. It is not limited to a specific project but it occurs with all of the projects. Even with sample projects from Microsoft.
Kind regards