Forum Discussion

Dribblej's avatar
Dribblej
Brass Contributor
Apr 22, 2021
Solved

Problem: Project Accelerator Power app "Tasks" tab connected to P4TW UI

Hello,    I have been dealing with an issue for over a month now where the embedded Web Control on the Power App that compliments project 4 the web will not expand even to the point where I can see...
  • DonSchiavone's avatar
    Oct 17, 2023

    Dribblej  We had the same problem but found the solution is over here: 

    https://powerusers.microsoft.com/t5/Building-Power-Apps/PexWeb-Control/td-p/826814

    Essentially...

    The "An Error Has Occurred..." error in the designer made me switch back to the old form editor, which didn't have a "Expand first component to full tab" option.  After switching back to the new form editor, selecting the tab with the PEXWebControl [ignore the error], and checking "Expand first component to full tab" finally got it expanding to the full size.