Forum Discussion
PieterDeVisser
Jun 23, 2021Copper Contributor
Print with Microsoft Project to A0 format
Hello, A customer from me has the issue, that he cannot print with microsoft Project on the A0 format. When he wants to have it printed, he has to save it first with 'Print to PDF', and after tha...
PieterDeVisser
Jun 23, 2021Copper Contributor
No, he has not the posibillity to choose the A0 format (the format is not in the list), so he cannot print on A0
BrianKennemer
Jun 23, 2021Tin Contributor
OK so the sizes available depend on the printer driver, not Project itself. If the printer you are using supports A0 then Project will print to it. the Microsoft PDF driver does not support it. Neither does the XPS driver.
The Adobe PDF driver does if they have access to Adobe Acrobat. If they can install the printer they will be using onto their machine then that printer will allow for them to print direct.
The Adobe PDF driver does if they have access to Adobe Acrobat. If they can install the printer they will be using onto their machine then that printer will allow for them to print direct.
- PieterDeVisserJun 23, 2021Copper ContributorHello,
Thanks for your time and answer. The thing is: They use the A0-format with a lot of other programs, and they are printing. So the printer and driver are supporting that.
He has a adobe acrobat also, and he uses it also for printing Ao. thats working.
Only Microsoft Project will not print on A0 on that plotter...
Any Idea?
Thanks!- BrianKennemerJun 23, 2021Tin ContributorSo you are saying that when it goes to pick a size he sees A0 but then he selects it, it doesn't work?
- BrianKennemerJun 23, 2021Tin Contributor
OK I tried this myself and it kept reverting back to 8.5x11 so I clicked on Printer Properties and then changed this setting to A0. Then it worked.