Forum Discussion
James_Price
Apr 08, 2021Brass Contributor
POL timesheets re deleted project...
Hi team If users have clocked time (entered timesheets) for a particular project, but PMO then delete the project and the related sharepoint site, will the timesheets be deleted as well or will t...
- Apr 11, 2021No you are right James. I though you can delete associated timesheets when deleting a project but they are not correlated. Meaning that you dont delete timesheets by default when you delete à project.
Guillaume Rouyre
Apr 09, 2021Brass Contributor
Hi James_Price
When the admin or PMO deletes a project, he has the option to delete also associated timesheets, but this option is not checked by default.
So if the PMO hasn't checked this option while deleting the project, the timesheets should still be in the database (which makes sense).
- James_PriceApr 11, 2021Brass ContributorThanks for this Guillaume. But in Pwa Settings and Delete Enterprise projects, where is the option to delete associated timesheets, as I can't find it.
Cheers
James- Guillaume RouyreApr 11, 2021Brass Contributor
Here is a capture from a blog, where you can decide to delete timesheets, for PWA/server settings/delete enterprise objects

- James_PriceApr 11, 2021Brass ContributorHi Guillaume
But this doesn't state deleting 'associated timesheets' or am I missing something?
Sorry for being a bit slow on this
James