Hi, 

 

We have been using Planner and Projects 3 online for the last few months and we needed a bit more functionality, so we downloaded the Project Professional desktop app as per the instructions.  Now I want to get all my plans/projects that is in my planner and Projects 3 online accessible or available in Project Professional on my desktop and I have no idea how to do this; please can you assist. 

I cannot find a way to download paths or files from online to a local drive to be able to open them in the desktop app.

1 Reply

  • RodFromm's avatar
    RodFromm
    Steel Contributor

    It's not possible to open/edit a Planner project with MS Project Desktop software.  Many have ask for this, but Planner is a very lightweight PM tool and I doubt we will ever see this integration with the MSP desktop app.