Opening and Viewing Option for Two MS Project Files Simultaneously on Two Screens?
Hi Can two MS Project files be opened on two different screens at the same time? This option is should be there as it is for other usual MS software like Word, Excel etc. Hope this can ...
- Feb 14, 2023
You can open either 2 windows of the same file or 2 completely different files at the same time across 2 screens.
I use a triple screen set up with my laptop and 2 x 34 inch widescreen monitors, with the display setting set to extend the desktop.
To achieve this you just need to reduce the project window from full screen view to a resizable window and then drag it to fill the two screens. When you have both files open you can use the Arrange All button in the View Tab to have them side by side one on the left screen and one on the right. - Resize them as necessary to make them fit perfectly. I do this all the time and it works perfectly.
bella160
Apr 27, 2022Copper Contributor
John
Sorry, this is a miserable excuse!!! MS Project developers are completely ignoring the grave importance of users opening one MS project program file PER SCREEN!!! So, like Excel, Word, PP, or Outlook, I would be able to open one MS Project file for one monitor, and another different MS Project file for my second monitor! Can you and John NOT SEE what he is trying so ardently to say to you????? This IS A GRAVE OVERSITE (I think on purpose) of MSP developers. For those of us who have worked MSP for 15 years, this is a bad problem. This is why so many companies are nixing MSP and going P6 and Open Plan!! Deltek has covered the gaps where Microsoft refuses!! We are professionals who work multiple files every single day and some of us are working project files with 50 thousand task lines and more!!! Give us a break!!
Sorry, this is a miserable excuse!!! MS Project developers are completely ignoring the grave importance of users opening one MS project program file PER SCREEN!!! So, like Excel, Word, PP, or Outlook, I would be able to open one MS Project file for one monitor, and another different MS Project file for my second monitor! Can you and John NOT SEE what he is trying so ardently to say to you????? This IS A GRAVE OVERSITE (I think on purpose) of MSP developers. For those of us who have worked MSP for 15 years, this is a bad problem. This is why so many companies are nixing MSP and going P6 and Open Plan!! Deltek has covered the gaps where Microsoft refuses!! We are professionals who work multiple files every single day and some of us are working project files with 50 thousand task lines and more!!! Give us a break!!
John-project
Apr 27, 2022Silver Contributor
bella160 and MZ_Rasheed,
You two are both railing on Dale and myself for something over which we have ABSOLUTELY no control. WE DO NOT WORK FOR MICROSOFT. Your best option is to provide input directly to Microsoft via the Feedback channel in Project.
John
You two are both railing on Dale and myself for something over which we have ABSOLUTELY no control. WE DO NOT WORK FOR MICROSOFT. Your best option is to provide input directly to Microsoft via the Feedback channel in Project.
John