Forum Discussion
MS365 Project Drawings
John
If i open a document and add a textbox, the textbox is showing. If i toggle then the textbox appears and disappears. Afterwards i save the document and re-open it, and the textbox is not showing but the option is ON. On another laptop with the same version of Project the textbox is showing. So i dont understand it :-)
Veysie,
Okay but what I said was try toggling the textbox option off and on when you re-open the file and the textbox is not showing initially. Does toggling the option make the textbox appear?
And how about the suggestion to add a textbox to a view other than the Gantt Chart view (i.e. Tracking Gantt view). Does that textbox disappear after saving and re-opening the file? I'm trying to establish if the issue is limited to the Gantt Chart view only.
John
- VeysieNov 26, 2024Copper Contributor
John
No it doesnt appear after reopening the file and toggling the option.
I've tried different views but the textbox isn't showing in any view.
- John-projectNov 26, 2024Silver Contributor
Veysie,
Yeah that is pretty weird. If it was just on the PCs with subscription versions (i.e. O365), I would tell you to have you IT folks open a ticket with Microsoft support.
What update do you have installed on the PC with Project 2019?
John
- VeysieNov 27, 2024Copper Contributor
Thanks for the reply's John!