There ya go, throwing down a challenge. I'll give it a go and see what I can come up with. Stay tuned.
Update (a few minutes later).
As usual you are correct in that with current versions of Project the bold horizontal line is neither present nor available to display. However, when I stepped into my wayback machine and tried this on Project 2010, not only can I show the bold line but I can also delete it by turning off the bar styles option "show availability line". Another gotcha from our good friends at MS. Maybe, just maybe, it's an artifact from the assignment units/peak units change that was made back in that time frame.
John
Where did you find that screenshot? I created a project with the same overallocation, and my Resource Graph view DOES NOT display the black gridline that is shown in your screenshot. So, the best I can tell you is that it is NOT possible to display the Max. Units gridline in the Resource Graph view. But if I am wrong, I would gladly invite the others to correct me and to tell me how to display it. Hope this helps.
There ya go, throwing down a challenge. I'll give it a go and see what I can come up with. Stay tuned.
Update (a few minutes later).
As usual you are correct in that with current versions of Project the bold horizontal line is neither present nor available to display. However, when I stepped into my wayback machine and tried this on Project 2010, not only can I show the bold line but I can also delete it by turning off the bar styles option "show availability line". Another gotcha from our good friends at MS. Maybe, just maybe, it's an artifact from the assignment units/peak units change that was made back in that time frame.
John
- KAA_82Apr 27, 2024Copper Contributor
Thanks for the clarification.
- John-projectApr 28, 2024Silver ContributorKAA_82,
You're welcome and thanks for the feedback.
John