MS Project 2019 hangs when save-as PDF to network share
Have tested multiple times with both new & old mpp files.
There is no issue saving the mpp file to a network share, however when selecting save-as PDF or export-as PDF to the same network share, Project hangs and just leaves a .tmp file in the destination folder. Project has to be forced to shut down, no error message displayed.
Save-as PDF (or export-as PDF) to the local hard drive works without issue.
Have tested with a different user, same result.
Think I have eliminated the server as the root cause. Firstly, same thing happens to two different file shares on two different servers. I also created a new share granting full permissions to the end-user, and the problem persists.
Using Word, Excel, Powerpoint save-as PDF option all work with no issue on the same file share, problem appears isolated to Project.
Environment:
W10 21H2 10.0.19044.1415 (64bit)
Project 2019 MSO V2111 Build 16.0.14701.20254 (64bit)
Office M365 MSO V2111 Build 16.0.14701.20254 (64bit)
- For anyone that gets here via search engine - identified issue was resolved by Microsoft with Version 2203 (Build 15012.20000).
1 Reply
- JohnKapaCopper ContributorFor anyone that gets here via search engine - identified issue was resolved by Microsoft with Version 2203 (Build 15012.20000).