Forum Discussion
Nicol860
Apr 09, 2021Copper Contributor
IIf formula in microsoft project custom field
I added the following custom field with the formula: [Remaining Work] / [Remaining Duration] Now I want to add an "if" condition, meaning if a task is 100% complete, that no value or the value "...
Brent30
Jun 29, 2024Copper Contributor
John - So for this project file, this is not a typical project phased type model. What i am being asked to build is a single-file schedule with small (8-12 lines) individual repair efforts for various locations; each with its own PoP end dates set a deadlines. Each of these repairs would roll up to its own summary, so at the summary level, it would provide easy visibility into the target deadline for each repair vs. current status of each. For tasks that are 100% complete, the total slack field at the summary level will not ignore 100% completed tasks, but i have now found a formula that works well for this when applied to a custom duration field, so my initial issue has been resolved.
John-project
Jun 29, 2024Silver Contributor
Brent30,
Okay, if that works for you, then great. Thanks for the feedback.
John
Okay, if that works for you, then great. Thanks for the feedback.
John