Forum Discussion
How to install MS Project Server on Windows 10?
- Jun 27, 2022
Hello ivan987896546 ,
You can try Project Online (Project Web App) free for one month: https://www.microsoft.com/en-gb/microsoft-365/project/project-plan-3?activetab=pivot:overviewtab
Project Server / Online specific solutions built using CSOM will typically work both on premises Project Server 2013, 2016, 2019, Subscription version and Project Online as the CSOM APIs are pretty much the same.
Paul
Hello ivan987896546 ,
Project Server needs to be installed on Windows Server, the version of Windows Server will depend on the version of Project Server, see the links in this doc for details on the software requirements: https://docs.microsoft.com/en-us/project/deploy-project-server-2016
You can get a 180 day trial here: https://www.microsoft.com/en-us/download/details.aspx?id=103599
Paul
1. Is there any online test version of MS Project Server where you can practice development?
In particular:
- raise the SOAP service;
- working with the bus;
- copying tasks, assignments, connections from one project to another;
2. Can I create a project in Visual Studio that will contain SharePoint and use MS Project Server?
- Paul_MatherJun 27, 2022MVP
Hello ivan987896546 ,
You can try Project Online (Project Web App) free for one month: https://www.microsoft.com/en-gb/microsoft-365/project/project-plan-3?activetab=pivot:overviewtab
Project Server / Online specific solutions built using CSOM will typically work both on premises Project Server 2013, 2016, 2019, Subscription version and Project Online as the CSOM APIs are pretty much the same.
Paul
- ivan987896546Jun 27, 2022Copper ContributorI can't find Project Online from the link you suggested
Could you please drop a more detailed link or picture of where Project Online is located and how to register there?- ProjectFutureJun 27, 2022Brass Contributor
ivan987896546 the link Paul included brought me to the screen where I snipped the attached pic. The buy button on the right has a link below it that shows free trial.