Forum Discussion
Nat37
Apr 04, 2023Copper Contributor
How to add column in Project for the web app
Hi, When i open project for the web app, in the default view I see all projects listed , there I want to add a new column displaying the type of the project. Eg: Currently I have (Name,Start Date, ...
- Apr 05, 2023
Hello Nat37 ,
If you used the 2nd link to add the new columns to the Dataverse tables, these will be accessible in Power BI. Here is an article on how to add new columns to the Power BI template / report: https://support.microsoft.com/en-us/office/extend-the-power-bi-template-for-project-for-the-web-23fb86a7-e1b2-45fc-b82b-8f64ae44c51c
Paul
Apr 04, 2023
Nat37 --
God it. You are using the Project for the Web model driven app in Dynamics CRM. And you are describing the My Active Projects view that contains those default columns. If you click the Edit columns button, the system displays the Edit Columns sidepane on the right side of the screen. In the Edit Columns sidepane, you can click the + Add Columns button at the top and the system displays the list of all available default and custom columns. As it currently exists, it does not appear there is any way to create your own custom Project Type column. Sorry, but hope this helps.
God it. You are using the Project for the Web model driven app in Dynamics CRM. And you are describing the My Active Projects view that contains those default columns. If you click the Edit columns button, the system displays the Edit Columns sidepane on the right side of the screen. In the Edit Columns sidepane, you can click the + Add Columns button at the top and the system displays the list of all available default and custom columns. As it currently exists, it does not appear there is any way to create your own custom Project Type column. Sorry, but hope this helps.
Nat37
Apr 05, 2023Copper Contributor
Hi Dale,
Using your approach, I could add the column I wanted, but we cannot enter the date corresponding to each project in the new column.
We don't have that functionality, I believe.
Using your approach, I could add the column I wanted, but we cannot enter the date corresponding to each project in the new column.
We don't have that functionality, I believe.