How can I create Grouping by Text Field in MS Project?

Hello. How can I create Grouping by Text Field in MS Project like a substitution table? BR, Vasily  
  • John-project's avatar
    John-project
    Sep 03, 2021

    Vasily_Zaytsev

    Okay, then why not simply sort by Outline Level. This structure:

    Gives this result:

    If that doesn't work for you (i.e. you really, really, really need the grouping format), then it can be done with something like this:

    But if you absolutely just have to have a pure grouping format of the Text1 (e.g. WBS) field, then that can be done with some VBA.

     

    Wow, so many options. I'm sure your head is spinning.

    John