Forum Discussion

ChadMcK's avatar
ChadMcK
Copper Contributor
Oct 26, 2023

Hide/Remove 'Project Site' from Left Side Navigation

Hello,

I have an Enterprise Project Type (EPT) that will not be utilizing the 'Project Site' within Project Online. Therefore I'm trying to either hide/remove the 'Project Site' quick link in the left side navigation. Is there a way to do this? I only want to hide/remove from this specific EPT as I have other EPTs that will utilize the project site.

When looking at a project using the 'edit links' from the left side navigation it only allows me to edit the bottom half of the left side navigation. The top half are the PDP's for the project, but it's the 'Project Site' that I'm trying to hide/remove. Since there is no plan to have a site created for this EPT, I'd like to hide/remove this link to eliminate any questions from Project Managers asking about the site as the link will take them to a page that states a site has not been created.

No RepliesBe the first to reply