Field System Identification & GUIDs
- Jan 31, 2024
Hello Clemay300 ,
I've not looked for this in detail but I don't think you will easily the field GUIDs for standard fields such as Start, Description etc. A quick look on the PDP using Dev Tools does show the GUID:
I've compared the GUID value for a custom field on the PDP and that matches the custom field GUID so I assume this is the correct GUID for standard fields also.
I hope that helps
Paul