Forum Discussion
Michael Lockhart
Sep 21, 2017Copper Contributor
Enable PWA for a O365 group site
Hi all,
Is it possable to enable PWA for a O365 Group site?
ive been able to enable it for our standalone sites, but as the Group sites do not show up under the admin center. this cant be done.
i assume there is a powershell command? (new to the powershell stuff)
Thanks,
Michael
5 Replies
- Brian-SmithFormer Employee
PWA can only be enabled on a subset of SharePoint site template types - and Group sites are not in that list Michael. Sorryfor the delayed response.
Brian.
- John FitchCopper Contributor
Brian-Smith Are there any plans to change that?
- Paul YoungbergSteel ContributorNo worries! When I entered in Brian the drop down list disappeared so it looked like I couldn't tag you. It worked if I just ignored the dropdown and typed your full name out. Glitchy! Thanks for the response.
- Paul YoungbergSteel ContributorTried to tag Brian-Smith but no luck. Who maintains this community on the MSFT side aside from him?
- Paul YoungbergSteel ContributorWould like to know as well