Forum Discussion
Trutz_Stephani
Nov 22, 2017Steel Contributor
Deploying Project 2016 C2R (Insider) on Terminal Server doesn't show new features
I deployed Office 2016 Pro Plus and Project as C2R installation on Remote Desktop Services (Windows Server 2016) using the Office Deployment Tool and following the advice in the support article: http...
Trutz_Stephani
Dec 04, 2017Steel Contributor
Hi Brian-Smith,
Sorry to bother you again with the topic. I created the ticket last week but received so far no initial call nor initial email from the engineer assigned. Instead it says in the Admin portal, that an engineer is reviewing the case. Is this a normal delay?
Therefore I tried the installation on a second Terminal Server with the same results. I used the same configuration file (except for the sharing property) on a Win 10 VM and it worked without issues.
Kind regards,
Trutz
Brian-Smith
Dec 04, 2017Former Employee
Ping me the case number at brian.smith@microsoft.com and I'll see if I can trace where it got to Trutz.
Sorry for the runaround you are getting here.
Best regards,
Brian.