Forum Discussion
Deploying Project 2016 C2R (Insider) on Terminal Server doesn't show new features
I haven't yet Trutz, busy over the holiday weekend/weeks. I suspect you are correct, as I have seen the features not light up until you have opened and accepted the license then restarted - ti feels like that isn't happening in this virtual environment. Is there a support case open?
Best regards,
Brian.
Hi Brian,
Thanks for your feedback I just opened a support case: Ticket #6857103
Kind regards,
Trutz
- Trutz_StephaniDec 04, 2017Iron Contributor
Hi Brian-Smith,
Sorry to bother you again with the topic. I created the ticket last week but received so far no initial call nor initial email from the engineer assigned. Instead it says in the Admin portal, that an engineer is reviewing the case. Is this a normal delay?
Therefore I tried the installation on a second Terminal Server with the same results. I used the same configuration file (except for the sharing property) on a Win 10 VM and it worked without issues.
Kind regards,
Trutz
- Brian-SmithDec 04, 2017Former Employee
Ping me the case number at brian.smith@microsoft.com and I'll see if I can trace where it got to Trutz.
Sorry for the runaround you are getting here.
Best regards,
Brian.
- Trutz_StephaniDec 05, 2017Iron Contributor
At the end, the case was closed as the behavior is currently "by design" for terminal services environments, on which Project is installed using the "SharedLicensing" setting in the Office deployment tool.
I was asked to create a UserVoice entry, which I did: