Forum Discussion
Default scheduling mode Project app
On top of what Paul shared below you can also insert the selection box for this setting in your Planner Power App and pick it when you start your project/plan. See image below.
Keep in mind you can only set this once, upon plan initiation. You can't change the mode later, so make sure you have a good idea as to the type of planning and tracking you'll be doing in your schedule prior to picking fixed work or duration.
You probably don't want to pick 'fixed units' because there's really nowhere in the tool to adjust this for each resource like you can in MS Project Pro or Online. Planner Premium uses fixed work and duration as the key scheduling modes. The drop down in the Power App just provides these two options (fixed duration or work).
- Constant2250Feb 06, 2025Copper Contributor
Do you have any pointers on how to do this: "insert the selection box for this setting in your Planner Power App and pick it when you start your project/plan"? So that it shows up in Planner.
I know it's a field in the Project power app. But it doesn't show up when creating a plan (in Planner or Teams).
- Constant2250Feb 06, 2025Copper Contributor
Thanks, I didn't know I could get the selection box in the Planner app as well, good to know.
In this particular case however, the project is within one of my clients tenants and they have not set the parameter to allow projectmanagers to change the scheduling mode, which is what I'm trying to have them do. By default that is locked, which I believe is also see the case in your screenshot (the lock after the red asterik).