Custom multiline text field doesn't retain input after editing and saving
Hello,
I created a custom, multiline text field in Project Online (Enterprise) and added the field to the Project Details page. When I edit, add text and save, nothing displays. When I go back to edit mode, the field is blank. If I change the custom field to a single line of text, it works fine and displays after hitting save. Is there anything special about using a multiline text field, am I missing a step? Thanks.
4 Replies
- John-projectSilver ContributorMicheaPaolucci,
If it's anything like the standalone desktop version of Project, all text fields, with the exception of the Notes field, are limited to 255 characters or the first line feed. Beyond that, text is truncated.
John- MichaePaolucciTin ContributorThanks John, even if I type only one word using the multiline field, it doesn't get saved.
- John-projectSilver ContributorMichaePaolucci,
Okay, it was just a thought. Hopefully Paul or Dale will jump in and give you a more definitive answer.
John