Forum Discussion
willard800
Jan 19, 2022Tin Contributor
Critical task row red
Good day every one. So, when i took over this schedule, some really important tasks (maybe 8-10) were manually colored blue and green. So i changed their color back to normal (black). Some of THESE ...
John-project
Jan 19, 2022Silver Contributor
Willard800,
I'm guessing whoever set up the custom formatting probably did so on a task by task basis such that the Gantt Bar for each of those tasks overrides the general setting under Bar Styles. Try this. Double click the Gantt Bar of one of those tasks and in the Format Bar window hit the "Reset" button. Repeat this for each of the tasks with the odd behavior.
John
I'm guessing whoever set up the custom formatting probably did so on a task by task basis such that the Gantt Bar for each of those tasks overrides the general setting under Bar Styles. Try this. Double click the Gantt Bar of one of those tasks and in the Format Bar window hit the "Reset" button. Repeat this for each of the tasks with the odd behavior.
John
willard800
Jan 19, 2022Tin Contributor
Thanks for responding, tried it, did not work
- John-projectJan 19, 2022Silver ContributorWill,
Then I think Dale hit the nail on the head, those tasks are in fact, not on the critical path.
John