Comment remplacer une ressource par une autre en VBA
Bonjour, J'ai un problème fort simple, mais que je n'arrive pas à résoudre en VBA. J'ai une ressource, on va dire Toto J'ai une autre ressource, on va dire Tutu Je voudrais transférer l...
- Feb 09, 2022
Thanks for your help, I've tight schedule to respect, and have no time for translating and editing code to make it smaller.
I guess, I'll have to take another approach that is less tedious, althought it might require much more manual editing.
John-project
Feb 09, 2022Silver Contributor
pascalito,
Okay, thanks. I'll copy your code to my PC, perhaps do a little translating and then do some testing. It may be a day or two before I can get back to you.
John
Okay, thanks. I'll copy your code to my PC, perhaps do a little translating and then do some testing. It may be a day or two before I can get back to you.
John
pascalito
Feb 09, 2022Copper Contributor
John-project Thanks, Let me know,
- John-projectFeb 09, 2022Silver Contributorpascalito,
I took a quick look at your macro code but find there is too much missing (e.g. no variable declarations), too many French based variable names that don't translate to English and not enough comments. It would take too much effort on my part to figure it out such that I could make constructive comments. If you can translate your code to English, I'll have another look but otherwise I'm afraid your have to find a French based forum to get help.
John- pascalitoFeb 09, 2022Copper Contributor
Thanks for your help, I've tight schedule to respect, and have no time for translating and editing code to make it smaller.
I guess, I'll have to take another approach that is less tedious, althought it might require much more manual editing.- John-projectFeb 10, 2022Silver Contributorpascalito,
You're welcome and thanks for the feedback. Sorry I couldn't have offered more help.
John