Color Coded WBS using Microsoft PPM

Hi Everybody.

 

Is it possible to apply any color scheme to the project on PWA the same way it is done on Project desktop?  

The picture below shows the result using Project Desktop using VBA. The source can be found by accessing this link

(https://answers.microsoft.com/en-us/msoffice/forum/all/vba-macro-for-ms-project-color-coded-wbs/31177eb4-f3bc-4291-a530-0d67ef7a9023)

 

Thanks for any help.

 

 

2 Replies

  • tanzimshaikh's avatar
    tanzimshaikh
    Brass Contributor

    Hello rogeriopsvalle ,

    Yes you can have a colour coded view from the PWA Settings --> Grouping Formats, as shown below. However it is restricted to the 4 levels only.

    • rogeriopsvalle's avatar
      rogeriopsvalle
      Copper Contributor
      Thanks tanzimshaikh ,
      I think It is not possible to accomplish what I intend to do using PPM.
      This feature using groups is great but not what I need.
      Best Regards