Collapsing a master / Sub plan with links between projects into a single file
I have a simple master plan with 3 inserted files. There are dependencies between the files, indicated by a Dep in / out field and a unique reference. I have a macro which can make and break electr...
John-project
Nov 10, 2022Silver Contributor
Miles,
"Bleep"? What are you, a human or a robot?
John 🙂
"Bleep"? What are you, a human or a robot?
John 🙂
Miles_Goodchild
Nov 10, 2022Brass Contributor
It censured me 🙂
- John-projectNov 10, 2022Silver ContributorMiles,
What do you mean by "censured"?
John- Miles_GoodchildNov 10, 2022Brass ContributorI entered the work for an engineering structure that holds a large body of water back and it replaced it with beep.
**bleep** 🙂- John-projectNov 10, 2022Silver ContributorMiles,
Yeah that's what I thought. I got your e-mail and will reply shortly.
John