Change Enterprise Project Type in Project Server 2016 using CSOM or SharePoint Designer Workflow
I've covered below steps in Project Server 2016:
1. Created a default Enterprise Project Type - 1 and Stage 1.
2. Create a workflow in SharePoint Designer 2013 and associated with EPT1.
3. Assigned PDP.
4. I need to transit to next EPT2 and Stage2 from workflow of Stage1.
I am looking for support that How to change Enterprise Project Type (EPT) in Project Server 2016 using CSOM or SharePoint Designer Workflow.