Planner Tasks cannot be deleted or edited.
Is there a way to just reset the entire Planner and start over. I do not have that much in the planner now. New license? Any other ideas? This is corporate system, but if that is the only solution, it would be doable. I have instructed our IT manager to train everyone on if you are going to delete a plan, first delete all tasks. Then delete plan. I hope that works. We did not try it yet however. tyger
- dlewis2849May 21, 2020Copper Contributor
Our outstanding IT guy found the solution. I worked for us. Try it. If it works, please post to other threads. I am not active here but only look occasionally.
He used the 12 steps from here: https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum/suggestions/14901261-bug-when-you-delete-a-plan-the-tasks-get-orphane
Let me know if it works for you!
- tygerMay 21, 2020Copper Contributor
I have seen the post lately but as the plan is deleted I could not export it to excel to get the Task ID. However, now I tried to delete the task and it has gone for good 🙂 I think the engineers at Microsoft played with the codes 😉 So I think now the problem is fixed and there is no need to delete the tasks in advance if you need to delete the plan.
But anyway, thank you for sharing the information.
- KenzukMay 29, 2020Copper Contributor
This would be an outstanding solution IF the plan was not deleted. That is the whole issue, I don't see how that solution is to the same problem as here (the orphaned tasks from a "deleted" plan).
- dlewis2849May 29, 2020Copper Contributor
We did have this issue and the above solution did solve our orphaned tasks where the Plan was deleted. I have not tried to recreate the orphan task issue since I did not want to see if it does work again at the risk of orphaned tasks. Now we delete all tasks and then delete the plan.
Also, noted that if I change the plan name, the old and new tasks DO NOT list the new name in the MY TASKS list. So I have tried to be sure what I want to call the plan is thought out before starting. Twice now I have had to start a new plan with the new name and slowly mover each task over. The do the delete process I mentioned above. Good Luck. .Kenzuk