Hi There,
I am looking for Planner yearly view similar to Weekly and monthly view. Is it possible to customize planner page.
Thank you.
- brendansimonCopper ContributorOne would think that quarterly (+3 months) and yearly (+12 months) views should be standard view periods, of a drop down edit box to specify the number of periods to display (e.g. 15 weeks, 3 months, 1 year). No need for full custom views. Wouldn't be that hard and would help with most projects lasting greater than 1 month.
- SanthoshB1Bronze Contributor
AshishJP the workaround is to connect the planner with Power Bi (by available apps) and you can generate the reports in Power BI.
- ijennykim1
Microsoft
SanthoshB1 Does connecting Planner data to Power BI requires special connector, or is it just simple as importing data from Excel? Also, wondering if importing + refreshing data can be done using Power Automate.
- SanthoshB1Bronze Contributor
ijennykim1 Import and parsing the data to Power BI is simple and can be done from Power BI desktop app. To schedule the refresh you need the third-party apps such as Apps4Pro Planner to take care of the scheduled refresh.
- No sorry! Customization isnt the stronger side of Planner
- brendansimonCopper Contributor
adam deltinger- surely quarterly and year views should be standard view periods, of a drop down edit box to specify the number of periods to display (e.g. 15 weeks, 3 months, 1 year). No need for full custom views.
- Adam DeltingerCopper ContributorNo sorry! Customization isnt the stronger side of Planner