Planner Graph Visual - Status Counts No longer Visible
Thank you for the recent Planner update. Unfortunately, the changes to the Status chart in the Charts view have significantly reduced its usefulness for our team.
In the previous version, the Status chart displayed the number of tasks for each status directly below the chart (Not Started, In Progress, Late, and Completed). This made it easy to capture a single screenshot that clearly showed both the visual breakdown and the exact task counts of our work for client and team reporting.
With the new update, those individual counts are no longer displayed. Instead, the chart only shows the total number of tasks/tasks remaining, and the individual status counts can only be viewed by hovering over each section of the chart.
This creates two issues:
We regularly use this chart in screenshots for client-facing reporting and team updates. We can no longer capture all status counts in a single screenshot and would need multiple screenshots to communicate the same information.
When hovering over a status to see its task count, the pop-up can cover the number displayed in the center of the chart, making the visual even more difficult to capture and present clearly.
Would it be possible to restore the previous functionality that displayed each status and its corresponding task count directly beneath the chart, or provide an option to enable those labels?
The previous layout was much more useful for reporting because all of the relevant information was visible at a glance without requiring any interaction with the chart.
Thank you
1 Reply
- AmezingtechsataraIron Contributor
You're describing the new Charts view as it is now, not something broken on your plan — the per-status counts under the chart went away with the redesign, and there's no setting I've found that brings them back. The hover tooltip is the only place the individual counts live in that view, which is exactly the problem for screenshots.
For the reporting you need, I'd stop fighting the chart and use Board view grouped by Progress instead. Each column there carries its own count at the top, so Not Started, In Progress, Late and Completed all show their numbers in a single screenshot, which is what you were getting from the old chart. If you need the exact figures in writing rather than a picture, the Grid view's export to Excel gives you the whole plan and you can count the statuses there.
Worth sending this in through Planner's in-app feedback too — the chart is the reporting view, and the product team needs to hear that the counts under it were the part people actually used.