Additional Planner Level
Is there a way to add a level to Planner? We need something like this:
Header 1
Bucket 1
Task 1
Task 2
Header 2
Bucket 1
Task 1
Bucket 2
Task 1
etc... We need some way to categorize Buckets into groups. A possible work around for this would be if we could add a Label to the Bucket name, but as-is the Buckets are limited to just a name. We still need to keep the Checklists within each task, so that is not the level solution we need.