Forum Discussion
trae24
Aug 02, 2024Copper Contributor
How to view 2 weeks in new calendar
This was so easy in the old calendar. All I did was hold the CTRL button and highlight the days I needed to view, I would then be able to see 2 weeks on my screen and all the details of each day within that 2 week timeframe. I have tried everything in the new outlook and cannot figure out how to do this. Please help??? (This is a key feature I use for my business)
- trae24Copper ContributorI also just discovered I can no longer select/move multiple events on the calendar at the same time? Dragging them one-by-one is not efficient. Has anyone figured out a way to do this?