If so, then you have to use the second example which is based on the cell references, then fill down the target weeks and copy the formula down to calculate these weeks.
This shown in the attached file.
Erran,
I have attached the solution for you.
Hope that helps.
- Erran WilliamsNov 23, 2017Copper Contributor
Thank you Haytham for your reply.
This solution does work, however it only works for the current week.
Without me editing the formula for each week in the Pallets In column, is there a way for me to auto-populate the required info?
- Haytham AmairahNov 23, 2017Silver Contributor
If so, then you have to use the second example which is based on the cell references, then fill down the target weeks and copy the formula down to calculate these weeks.
This shown in the attached file.
- Enrique García PeñaApr 11, 2018Copper Contributor
Hello, thanks for your answer.
Do you know if I can use SUMIF in D2 at the doc that you uploaded?
I mean the same that you did with SUMIFS but with the rank of week in a single criteria?