First published on TECHNET on Oct 07, 2016
We are just rolling out some changes – and they should be hitting all Project Online tenant sites by now – which allow for Project notifications and reminders to be sent to accounts outside of Exchange Online. So as long as you have a ‘Work email’ configured with the desired address for the user they can get alerts for new task assignments and various levels of reminders. There is a setting that governs notifications working even if you do have Exchange Online – and this would need turning on too – so I’ll start with there. Go to PWA Settings, Additional Server Settings and scroll right down to the bottom – and the
Turn on notifications
option will be found. Check the box if it isn’t already checked.
In my tenant I have some users in Exchange Online, and others who are not. If I want the ones who are not in Exchange Online to also get notifications then I can add their e-mail addresses into their SharePoint User Profiles (if they are not already there) by navigating to the Admin portals, then selecting
SharePoint
under Admin Centers,
user profiles
once I get to the SharePoint Admin Center – and finally
Manage User Profiles
.
,
There should be a user profile for each user – if you don’t find one then maybe that user has not logged in yet. I am going to add a Work email to my BrianMSN2 account. This user has a Project Online license, but does not have an Exchange Online license. I use the find option – then I can right click to edit the profile.
The Work email field is quite a way down the long list of properties – and here I have set my Microsoft account..
So you can see, three of the ‘Brian’ accounts are using the Exchange Online accounts for the tenant – and BrianMSN2 should get their notifications through
BriSmith@Microsoft.com
.
Important to note that the e-mail address is not displayed under Manage User within PWA.
If I now assign a new task to BrianMSN2 – an e-mail should go out.
And here it is!
Thanks for all the hard work in the Project product group for making this happen. Of course if you already had the Work email configured (as SharePoint notifications already used this field) and PWA notifications turned on then your users may already have started seeing these hit their inboxes.