Microsoft Project Server and SharePoint Server 2007 and 2010 December 2012 CU Announcement
Published Mar 06 2019 12:56 PM 199 Views
Brass Contributor
First published on TECHNET on Dec 19, 2012

Welcome to the new site for the Project Support blog,  Still the same authors and great information – just a new url to bookmark and subscribe to.

I am pleased the announce the release of (most of) the 2012 December Cumulative Update (CU) for Project 2010, Project Server 2007, Project Server 2010, SharePoint Server 2007 and SharePoint Server 2010.  The SharePoint Server roll-up package will be delayed, as noted. Feel free to open a support case if you have any questions around this or need assistance getting these patches deployed.  Remember that this release for the 2010 products, like the August 2012 Cumulative Update, has a hard requirement on Service Pack 1 – see notes below.  In most of the KB articles the term hotfix is used in place of Cumulative Update.  They tend to be interchangeable terms – a Cumulative Update is just a hotfix built to a schedule.

As the were issues with the October release of the Project Server 2007 package you should use the December one which contains all the same fixes – and a few more.

Project and Project Server 2010

This include a number of fixes, so Microsoft strongly recommends that you test this in a test environment based on your production environment before putting this fix live in production.

The article below provides information on how to deploy the Project Server Cumulative Update.

You can read about the fixes included in the Project and Project Server August CUs from the following articles:

Server Rollup Package(Recommended): Delayed – hopefully out by the end of week of 12/17 *** Update - released 12/22 ***

Description of the Project Server 2010 cumulative update package (Project server-package):

http://support.microsoft.com/kb/2596956

Individual Project Server Package:

Only required if you do not install the Server Rollup.

Description of the Project Server 2010 hotfix package (Pjsrvwfe-x-none.msp): December 11, 2012

http://support.microsoft.com/kb/2553504

The version number is 14.0.6131.5000 and you can also expect to see the databases updated to this version number.

You may also come across a KB 2553268 for Project Server 2010 – this is just a subset of the one listed above and we would recommend installing the 2553504 package.

Project 2010 Client Package:

Description of the Project 2010 hotfix package (Project-x-none.msp): December 11, 2012

http://support.microsoft.com/kb/2553188

The version number is 14.0.6131.5000, in case you want to limit the connection of certain patched release to Project Server 2010.

More information on deploying the Cumulative Update:

The article below provides information on how to deploy the Project Server Cumulative Update.

Updates for Project Server 2010

http://technet.microsoft.com/en-us/projectserver/gg176680.aspx

As Project Server 2010 is now based on SharePoint Server 2010 we strongly recommend that you install the Project Server 2010 Server Rollup Package as there are a large number of individual server packages for SharePoint Server. The Project Server 2010 Server Rollup Package contains all the patches released in this Cumulative Update for SharePoint Foundation Server 2010, SharePoint Server 2010 and Project Server 2010.

As mentioned above, and at http://blogs.msdn.com/b/brismith/archive/2012/07/18/project-server-2010-from-august-2012-cumula... – the August Cumulative Update requires your client and server to already be at the Service Pack 1 (SP1) level – if you get a message saying the patch does not apply to your system then this may be the reason.

SP1 for the Project Server 2010 can be found at http://www.microsoft.com/en-us/download/details.aspx?displaylang=en&id=26636

SP1 for the Project Professional 2010 client can be found at http://www.microsoft.com/en-us/download/details.aspx?id=26635 for the 32-bit and http://www.microsoft.com/en-us/download/details.aspx?id=26627 for the 64-bit.

For those accustomed to Project Server 2007 Cumulative Updates, you should note that the MOSS Server Rollup Package does not contain the Project Server patches.   As in Project Server 2007, the Server Rollup Packages are much larger but they will greatly simplify your Project Server patch deployment.

Client Installation:

Installation of the client patch is straightforward and is the same as it was in Project 2007. The instructions for installing the client patch are below.

NOTE: Microsoft strongly recommends testing within a NON-Production environment prior to rollout.

1. Download the hotfix from the link in the KB Article.

2. Extract the patch package by running the .exe file that you downloaded.

3. Run the extracted .exe file to apply the patch to your Project Professional/Standard client.

Project Server 2007

This include a number of fixes, so Microsoft strongly recommends that you test this in a test environment based on your production environment before putting this fix live in production.

You can read about the fixes included in the August CU from the following articles:

Server Rollup Packages:

Description of the Windows SharePoint Services 3.0 cumulative update server hotfix package (WSS server-package): December 11, 2012

http://support.microsoft.com/kb/2760571

Description of the SharePoint Server 2007 cumulative update server hotfix package (MOSS server-package): December 11, 2012

http://support.microsoft.com/kb/2760570

Individual Product Packages:

Description of the Project Server 2007 hotfix package (Pjsrvapp-x-none.msp): December 11, 2012

http://support.microsoft.com/kb/2596757

Project 2007 Client Package:

Description of the Project 2007 hotfix package (Project-x-none.msp): December 11, 2012

http://support.microsoft.com/kb/2596808

More information on deploying the Cumulative Update:

The article below provides information on how to deploy the Project Server Cumulative Update.

Deploy cumulative updates (Project Server 2007)

http://technet.microsoft.com/en-us/library/dd239177.aspx

Server Pack 3 for Project and Project Server 2007 has been released.  While not required for the August CU, we strongly recommend that you install it as it contains a number of patches to improve performance and reliability.  The following blog goes into more detail about SP3.

Office 2007 and SharePoint 2007 Service Pack 3 Availability

http://blogs.technet.com/b/office_sustained_engineering/archive/2011/10/25/office-2007-and-shar...

SP3 may be optional, however, Service Pack 2 for both WSS and Office Servers 2007 are required for this Cumulative Update. The KB articles below provide information on how to download and install SP2 if you have not already done so.

Description of Windows SharePoint Services 3.0 SP2 and of Windows SharePoint Services 3.0 Language Pack SP2

http://support.microsoft.com/kb/953338

Description of 2007 Microsoft Office servers Service Pack 2 and of 2007 Microsoft Office servers Language Pack Service Pack 2

http://support.microsoft.com/kb/953334

The Server CU is released in two different versions. The first version is in Individual Packages specific to a particular product like WSS and Project Server. These are smaller downloads but they do not include language packs or patches for other products so patches for those products would have to be downloaded and installed separately.

The second version is the Server Rollup Packages. This is a set of two rollup packages which contains all the fixes for WSS, Project Server and MOSS. These packages should be used when MOSS is part of the deployment and/or you have language packs installed. The Server Rollup Packages are much larger but they will greatly simplify MOSS patch deployment.

Client Installation: (For reference – there were no fixes released for Project 2007 client in this cycle)

In order to install this hotfix, you will need to have Microsoft Project 2007 SP2 installed on the client.

Description of Office Project 2007 Service Pack 2 (SP2) and of Office Project Language Pack 2007 Service Pack 2 (SP2)

http://support.microsoft.com/kb/953326

Once we know that SP2 is installed, you will install the hotfix by performing the following steps:

NOTE: Microsoft strongly recommends testing within a NON-Production environment prior to rollout.

1. Download the hotfix from either the KB Article.

2. Extract the patch package by running the .exe file that you downloaded.

3. Run the extracted .exe file to apply the patch to your Project Professional/Standard SP1 client.

Feel free to open a support incident at http://support.microsoft.com if you run into any issues with the installation and we will be happy to help!


Version history
Last update:
‎Mar 06 2019 12:56 PM
Updated by: