June Project Update Blog

Published Jul 01 2021 08:33 AM 5,210 Views

Your feedback informs us on what you want added, improved, and enhanced in Project for the web.  As you may be aware, UserVoice will be retired at the end of June 2021. We value your input and want to keep the momentum of our conversations going. Please continue to provide us your suggestions either within the app or in the comment section below.  

The updates for June are as follows:  

 

New Features 

  • Choice Custom Fields: Create custom fields that allow you to quickly choose from several pre-set options. To learn more about these new fields, check out our blog post here 

MicrosoftProjectTeam_0-1625153574236.png

 

 

  • Filter by Progress States: Filter your projects so you only can see your Not startedIn progress or Completed tasks. Hide tasks that aren’t applicable to your work right now!  

MicrosoftProjectTeam_1-1625153574238.png

 

 

  • Filter on the Board & Timeline: Quickly find your tasks by filtering your tasks on Board & Timeline by keyword or assignee. 
  • Import from Project desktop: Users can import .mpp files from Project desktop to Project for the web. This functionality is available to all users, and you can learn more about how to use this feature by reading our blog post here. 
  • Project Power BI Template App: The Project Power BI Template is now available as an app accessible from Power BI or on App Source (Microsoft Project for the Web) 

MicrosoftProjectTeam_2-1625153574245.png

 

 

  • Copy link to task improvements: When you copy a link to your task, the link will be shown with the task name as the URL.  

Upcoming Features 

  • Assign tasks to non-group members:  Assign tasks to add anyone in your organization to your project automatically.  
  • Rollup Custom Fields: Add summary, average, max, or minimum calculations to your numeric custom fields. See the rollup value of all your subtasks in your summary task field. 

 

Microsoft Project Trivia! 

Last Month: 

  • Question: In project management, milestones often represent significant events that happen during the project process. How can you create milestones in Project for the web? 
  • Answer: You can create a milestone by setting your task’s duration to 0 days. 

This Month: 

  • Question: Users of Project for the web can use the Board view as a Kanban Board for work management. What language does the word Kanban originate from, and what does it mean in that language? 
10 Comments
%3CLINGO-SUB%20id%3D%22lingo-sub-2507610%22%20slang%3D%22en-US%22%3EJune%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2507610%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%20data-contrast%3D%22auto%22%3EYour%26nbsp%3Bfeedback%26nbsp%3Binforms%20us%26nbsp%3Bon%26nbsp%3Bwhat%20you%20want%20added%2C%20improved%2C%20and%20enhanced%26nbsp%3Bin%26nbsp%3BProject%20for%20the%20web.%26nbsp%3B%20As%20you%20may%20be%20aware%2C%20UserVoice%20will%20be%20retired%26nbsp%3Bat%20the%20end%20of%20June%26nbsp%3B2021.%26nbsp%3BWe%20value%20your%20input%20and%20want%20to%20keep%26nbsp%3Bthe%20momentum%20of%20our%20conversations%26nbsp%3Bgoing.%26nbsp%3BPlease%20continue%20to%26nbsp%3Bprovide%26nbsp%3Bus%26nbsp%3Byour%26nbsp%3Bsuggestions%26nbsp%3Beither%20within%20the%20app%20or%20in%20the%20comment%20section%20below.%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%3CSPAN%20data-contrast%3D%22auto%22%3EThe%20updates%20for%20June%20are%20as%20follows%3A%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3ENew%20Features%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EChoice%20Custom%20Fields%3A%26nbsp%3B%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3ECreate%20custom%20fields%26nbsp%3Bthat%20allow%20you%20to%20quickly%26nbsp%3Bchoose%26nbsp%3Bfrom%20several%20pre-set%20options.%20To%20learn%20more%20about%20these%20new%20fields%2C%20check%20out%20our%20blog%26nbsp%3Bpost%26nbsp%3B%3C%2FSPAN%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fproject-blog%2Fmake-the-choice-to-use-custom-fields%2Fba-p%2F2466783%22%20target%3D%22_blank%22%3E%3CSPAN%20data-contrast%3D%22none%22%3Ehere%3C%2FSPAN%3E%3C%2FA%3E%3CSPAN%20data-contrast%3D%22auto%22%3E.%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22MicrosoftProjectTeam_0-1625153574236.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F292934iCF3563E6DC6D7CA0%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22MicrosoftProjectTeam_0-1625153574236.png%22%20alt%3D%22MicrosoftProjectTeam_0-1625153574236.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EFilter%20by%20Progress%20States%3A%26nbsp%3B%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EFilter%20your%20projects%20so%20you%26nbsp%3Bonly%26nbsp%3Bcan%20see%26nbsp%3Byour%26nbsp%3B%3C%2FSPAN%3E%3CI%3E%3CSPAN%20data-contrast%3D%22auto%22%3ENot%20started%3C%2FSPAN%3E%3C%2FI%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%2C%26nbsp%3B%3C%2FSPAN%3E%3CI%3E%3CSPAN%20data-contrast%3D%22auto%22%3EIn%26nbsp%3Bprogress%3C%2FSPAN%3E%3C%2FI%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3Bor%26nbsp%3B%3C%2FSPAN%3E%3CI%3E%3CSPAN%20data-contrast%3D%22auto%22%3ECompleted%3C%2FSPAN%3E%3C%2FI%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3Btasks.%26nbsp%3BHide%20tasks%20that%20aren%E2%80%99t%20applicable%20to%20your%20work%20right%20now!%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22MicrosoftProjectTeam_1-1625153574238.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F292933iBA43EFE343C0D609%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22MicrosoftProjectTeam_1-1625153574238.png%22%20alt%3D%22MicrosoftProjectTeam_1-1625153574238.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%221%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%221%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EFilter%20on%20the%20Board%20%26amp%3B%20Timeline%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3BQuickly%20find%20your%20tasks%20by%20filtering%20your%20tasks%20on%20Board%20%26amp%3B%20Timeline%20by%20keyword%20or%20assignee.%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EImport%20from%20Project%20desktop%3A%26nbsp%3B%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EUsers%20can%20import%20.mpp%26nbsp%3Bfiles%20from%20Project%20desktop%20to%20Project%20for%20the%20web.%20This%20functionality%20is%20available%20to%20all%20users%2C%26nbsp%3Band%20you%20can%20learn%20more%20about%20how%20to%20use%20this%20feature%20by%20reading%20our%20blog%26nbsp%3Bpost%26nbsp%3B%3C%2FSPAN%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fproject-blog%2Fimport-your-project-desktop-files-to-project-for-the-web%2Fba-p%2F2435528%22%20target%3D%22_blank%22%3E%3CSPAN%20data-contrast%3D%22none%22%3Ehere%3C%2FSPAN%3E%3C%2FA%3E%3CSPAN%20data-contrast%3D%22auto%22%3E.%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EProject%20Power%20BI%20Template%20App%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%3A%26nbsp%3BThe%26nbsp%3BProject%20Power%20BI%20Template%20is%20now%20available%20as%20an%20app%20accessible%26nbsp%3Bfrom%20Power%20BI%3C%2FSPAN%3E%3CSPAN%20data-contrast%3D%22none%22%3E%26nbsp%3Bor%26nbsp%3Bon%20App%20Source%3C%2FSPAN%3E%3CSPAN%20data-contrast%3D%22none%22%3E%26nbsp%3B(%3C%2FSPAN%3E%3CA%20href%3D%22https%3A%2F%2Fappsource.microsoft.com%2Fen-us%2Fproduct%2Fpower-bi%2Fmicrosoftcorporation1619756240314.pbi_msprojectfortheweb%3Ftab%3DOverview%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3E%3CSPAN%20data-contrast%3D%22none%22%3EMicrosoft%20Project%20for%20the%20Web)%3C%2FSPAN%3E%3C%2FA%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22MicrosoftProjectTeam_2-1625153574245.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F292935iF794D2D416C33C86%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22MicrosoftProjectTeam_2-1625153574245.png%22%20alt%3D%22MicrosoftProjectTeam_2-1625153574245.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335551550%26quot%3B%3A2%2C%26quot%3B335551620%26quot%3B%3A2%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%223%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%221%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3ECopy%20link%20to%20task%20improvements%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3BWhen%20you%20copy%20a%20link%20to%20your%20task%2C%20the%20link%20will%20be%20shown%26nbsp%3Bwith%20the%20task%20name%20as%20the%20URL.%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EUpcoming%20Features%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EAssign%20tasks%20to%20non-group%20members%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3B%26nbsp%3BAssign%26nbsp%3Btasks%26nbsp%3Bto%20add%20anyone%26nbsp%3Bin%20your%20organization%20to%20your%20project%26nbsp%3Bautomatically.%26nbsp%3B%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3ERollup%20Custom%20Fields%3A%26nbsp%3B%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EAdd%20summary%2C%20average%2C%20max%2C%20or%20minimum%20calculations%20to%20your%20numeric%20custom%20fields.%20See%20the%20rollup%20value%20of%20all%20your%20subtasks%20in%20your%20summary%20task%20field.%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EMicrosoft%20Project%20Trivia!%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3ELast%20Month%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EQuestion%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3BIn%20project%20management%2C%20milestones%20often%20represent%20significant%20events%20that%20happen%20during%20the%20project%20process.%20How%20can%20you%20create%20milestones%20in%20Project%20for%20the%20web%3F%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EAnswer%3A%26nbsp%3B%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EYou%20can%20create%20a%20milestone%20by%20setting%20your%20task%E2%80%99s%20duration%20to%200%20days.%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%0A%3CP%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EThis%20Month%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FP%3E%0A%3CUL%3E%0A%3CLI%20data-leveltext%3D%22%EF%82%B7%22%20data-font%3D%22Symbol%22%20data-listid%3D%222%22%20aria-setsize%3D%22-1%22%20data-aria-posinset%3D%220%22%20data-aria-level%3D%221%22%3E%3CSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3EQuestion%3A%3C%2FSPAN%3E%3C%2FSTRONG%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3BUsers%20of%20Project%20for%20the%20web%20can%20use%20the%26nbsp%3B%3C%2FSPAN%3E%3CI%3E%3CSPAN%20data-contrast%3D%22auto%22%3EBoard%3C%2FSPAN%3E%3C%2FI%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3Bview%20as%20a%20Kanban%20Board%20for%26nbsp%3Bwork%20management.%26nbsp%3BWhat%20language%20does%20the%20word%26nbsp%3B%3C%2FSPAN%3E%3CI%3E%3CSPAN%20data-contrast%3D%22auto%22%3EKanban%3C%2FSPAN%3E%3C%2FI%3E%3CSPAN%20data-contrast%3D%22auto%22%3E%26nbsp%3Boriginate%20from%2C%20and%20what%20does%20it%20mean%20in%20that%20language%3F%3C%2FSPAN%3E%3CSPAN%20data-ccp-props%3D%22%7B%26quot%3B134233279%26quot%3B%3Atrue%2C%26quot%3B201341983%26quot%3B%3A0%2C%26quot%3B335559739%26quot%3B%3A160%2C%26quot%3B335559740%26quot%3B%3A259%7D%22%3E%26nbsp%3B%3C%2FSPAN%3E%3C%2FLI%3E%0A%3C%2FUL%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2519866%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2519866%22%20slang%3D%22en-US%22%3E%3CP%3EA%20custom%20text%20field%20for%20multi-line%20comments%20would%20be%20a%20great%20addition.%3C%2FP%3E%3CP%3EThe%20use%20case%20is%20this%20would%20allow%20us%20to%20take%20notes%20directly%20on%20each%20task%20while%20having%20a%20status%20call.%20Versus%20taking%20notes%20in%20OneNote%2C%20then%20adding%20the%20notes%20to%20the%20tasks%20outside%20of%20the%20status%20calls.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2524204%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2524204%22%20slang%3D%22en-US%22%3E%3CP%3EI%20concur%20with%20the%20above%20statement.%20Planner%20integration%20is%20hands-down%20the%20best%20feature%20that%20would%20jumpstart%20Project%20for%20the%20Web.%20Otherwise%2C%20it%20is%20severely%20limiting%20its%20use.%20Hopefully%20the%20development%20team%20reads%20these%20comments%20and%20is%20working%20on%20implementation.%20Otherwise%2C%20band-aids%20will%20never%20make%20this%20product%20what%20we%20are%20looking%20for.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2531604%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2531604%22%20slang%3D%22en-US%22%3E%3CDIV%20class%3D%22ms-Dialog-header%20header-422%22%3E%3CDIV%20class%3D%22ms-Dialog-title%20title-425%22%3E%3CDIV%20class%3D%22import-from-mpp-file-dialog-header%22%3E%3CSTRONG%3EImport%20from%20Project%20desktop%3C%2FSTRONG%3E%3C%2FDIV%3E%3C%2FDIV%3E%3CDIV%20class%3D%22topButton-426%22%3E%3CSPAN%3EThis%20will%20create%20a%20new%20Project%20for%20the%20web%20project%20separate%20from%20your%20Project%20desktop%20project.%20Note%20that%20some%20Project%20desktop%20features%20can't%20be%20imported%20into%20Project%20for%20the%20web.%3C%2FSPAN%3E%3CSPAN%3E%26nbsp%3B%3C%2FSPAN%3E%3CA%20title%3D%22Learn%20more%22%20href%3D%22https%3A%2F%2Fsupport.microsoft.com%2Fen-us%2Foffice%2Fmove-your-project-to-from-project-desktop-to-project-for-the-web-143ab391-002e-451a-aedb-3b6fa1f6ab8b%3Fui%3Den-us%26amp%3Brs%3Den-us%26amp%3Bad%3Dus%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3ELearn%20more%3C%2FA%3E%3C%2FDIV%3E%3CDIV%20class%3D%22topButton-426%22%3E%26nbsp%3B%3C%2FDIV%3E%3CDIV%20class%3D%22topButton-426%22%3EThat's%20a%20long%20list%20of%20unsupported%20features%2C%20but%20who%20is%20in%20the%20end%20using%20deadlines%3F%3C%2FDIV%3E%3C%2FDIV%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2537288%22%20slang%3D%22de-DE%22%3ESubject%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2537288%22%20slang%3D%22de-DE%22%3E%3CP%3E%3CSTRONG%3ETwo%20way%20integration%20with%20microsoft%20planner%20and%20Microsoft%20projects%3C%2FSTRONG%3E%3C%2FP%3E%3CP%3E%3CSPAN%3ESo%20this%20is%20quite%20an%20old%20comment%2C%20and%20I%20would%20like%20to%20know%20if%20there%20is%20any%20progress%20on%20the%20intetgration%20between%20Planner%20and%20Project%3F%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%3EA%20full%20two%20way%20integration%20with%20MS%20PLANNER%20and%20MS%20PROJECTS%20(P4TW%20especially)%20would%20be%20REALLY%20useful%20to%20enable%20full%20task%20management%20capabilities%20in%20the%20MS%20environnement.%3CBR%20%2F%3EProject%20managers%20need%20to%20ensure%20tasks%20are%20disptached%20to%20their%20owner.%20And%20the%20best%20place%20to%20deliver%20them%20and%20enable%20people%20to%20have%20a%20complete%20view%20ot%20their%20tasks%20is%20Planner.%3CBR%20%2F%3EFor%20the%20moment%2C%20people%20have%20to%20juggle%20between%20TO%20DO%2C%20PLANNER%20and%20PROJECT.%20TO%20DO%20and%20PLANNER%20TASKS%20are%20now%20integrated%20in%20TEAMS.%20%3CBR%20%2F%3E%20TASKS%20from%20PROJECTS%20should%20follow.%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2552833%22%20slang%3D%22de-DE%22%3ESubject%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2552833%22%20slang%3D%22de-DE%22%3E%3CP%3Ethe%20integration%20of%20tasks%20into%20planner%20is%20the%20most%20needed%20feature%2C%20as%20voted%20in%20the%20uservoice's.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2555688%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2555688%22%20slang%3D%22en-US%22%3E%3CP%3ETwo-way%20integration.%20Or%20it's%20just%20a%20useless%20tool.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2567733%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2567733%22%20slang%3D%22en-US%22%3E%3CP%3EI'm%20going%20to%20repeat%20what%20others%20have%20said%2C%20just%20because%20I%20hope%20it%20helps%20convince%20management%20at%20Microsoft%20to%20prioritize%20it%3A%3CBR%20%2F%3E%3CSTRONG%3ETwo-way%20integration%20with%20Planner%2C%20please!%3C%2FSTRONG%3E%3C%2FP%3E%3CP%3E%3CBR%20%2F%3EI%20will%20at%20lease%20elaborate%20on%20what%20I%20mean%2C%20a%20bit.%3C%2FP%3E%3CP%3EI'd%20like%20to%20see%20the%20ability%20for%20an%20individual%20task%20in%20Project%20to%20be%20two-way%20linked%20to%20an%20individual%20task%20in%20Planner%3A%3C%2FP%3E%3CP%3E-%20Notes%2C%20due%20date%2C%20assignment%2C%20labels%2C%20importance%2C%20status%3A%20all%20carry%20over%20and%20are%20two-way%20synced%3C%2FP%3E%3CP%3E-%20File%20attachments%2C%20subtasks%20(from%20Planner)%3A%20viewable%20on%20the%20task%20in%20Project%20OR%20let%20me%20at%20least%20click%20a%20link%20to%20get%20to%20the%20Planner%20task%3C%2FP%3E%3CP%3E-%20Buckets%20are%20mirrored%20between%20Project%20and%20Planner%3A%20Any%20bucket%20assignment%20in%20either%20is%20synced%20between%20the%20two%3C%2FP%3E%3CP%3E-%20If%20a%20task%2C%20that%20is%20linked%20to%20a%20Planner%20task%2C%20is%20gets%20assigned%20subtasks%2C%20and%20thus%20becomes%20a%20%22super-task%22%2C%20write%20protected%20fields%2C%20such%20as%20due%20date%2C%20are%20no%20more%20editable%20in%20Planner%20either%3C%2FP%3E%3CP%3E-%20Tasks%20can%20be%20linked%20from%20any%20planner%20plan%2C%20which%20is%20part%20of%20the%20same%20Microsoft%20365%20group%20as%20the%20project%20OR%20that%20the%20project%20manager%20can%20access%3C%2FP%3E%3CP%3E-%20When%20I%20mark%20a%20task%20as%20%22Done%22%20it%20is%20moved%20to%20a%20bucket%20that%20I%20determine%20in%20Planner%20and%20Project%20(this%20isn't%20possible%20in%20Planner%20today%2C%20just%20thought%20I'd%20mention%20it%20here%2C%20because%20we%20need%20it!)%3C%2FP%3E%3CP%3E-%20You%20can%20obviously%20add%20Planner%20tasks%20to%20Roadmap%20as%20well%3C%2FP%3E%3CP%3E-%20Tasks%20that%20are%20milestones%20can%20still%20be%20Planner%20tasks%2C%20even%20if%20their%20duration%20is%20zero%20(milestones%20in%20Project%20can%20still%20be%20assigned%20to%20buckets%2C%20given%20notes%2C%20aso.%3C%2FP%3E%3CP%3E%3CBR%20%2F%3EHow%20to%20link%20a%20task%20from%20Planner%20to%20Project%3A%3C%2FP%3E%3CP%3E-%20In%20Project%2C%20where%20you%20click%20%22Add%20a%20new%20task%22%2C%20there's%20a%20dropdown%20that'll%20let%20you%20select%20to%20%22Add%20a%20task%20from%20Planner%22%20-%20then%20you%20find%20the%20task%20you%20want%20to%20add%2C%20from%20the%20Planner%20plan%20you%20want%20to%20add%20it%20from.%3C%2FP%3E%3CP%3E-%20In%20Project%2C%20for%20an%20existing%20Task%2C%20you%20can%20choose%20to%20%22Add%20as%20a%20task%20in%20Planner%22%20-%20then%20you%20select%20a%20Planner%20plan%20to%20add%20the%20task%20to.%3C%2FP%3E%3CP%3E-%20To%20make%20the%20above%20easier%2C%20one%20could%20link%20Planner%20plans%20to%20the%20project%20under%20settings%20for%20the%20Project%2C%20but%20this%20should%20preclude%20tasks%20from%20being%20added%20from%20other%20projects%2C%20just%20help%20make%20it%20easier%20to%20find%20tasks%20that%20you%20want%20to%20sync%20with%20from%20Planner.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EOther%20important%20additions%3A%3C%2FP%3E%3CP%3E-%20Project%20managers%20in%20Project%2C%20can%20see%20all%20tasks%20across%20both%20Project%20and%20Planner%20in%20any%20Office%20365%20group%20that%20they%20can%20access%2C%20in%20one%20big%20list%2C%20which%20can%20be%20sorted%2C%20filtered%2C%20searched%2C%20grouped%2C%20aso.%3C%2FP%3E%3CP%3E-%20Add%20same%20functionality%20as%20mentioned%20above%20for%20DevOps.%20Two-way%20sync%2C%20ability%20to%20add%20DevOps%20tasks%20to%20plans%20in%20Project%2C%20ability%20to%20see%20ALL%20tasks%20in%20Planner%2C%20DevOps%20AND%20DevOps%20in%20one%20view.%3C%2FP%3E%3CP%3E-%20I%20haven't%20even%20mentioned%20Lists%20yet...%20the%20old%20Project%20was%20able%20to%20use%20SharePoint%20lists%20as%20task%20lists%2C%20so%20there%20is%20already%20precedence%20for%20it.%20This%20one%20IS%20more%20tricky%20though%2C%20as%20the%20new%20Project%20is%20based%20on%20CDS%2C%20so%20I%20don't%20know%2C%20but%20two-way%20sync%20here%20would%20be%20great%2C%20too.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EOpportunities%3A%3C%2FP%3E%3CP%3E-%20Opportunity%20to%20upsell%20from%20Planner%20to%20a%20Project%20Plan%20E3%20for%20project%20managers%20-%20we'd%20probably%20jump%20at%20this!%3C%2FP%3E%3CP%3E-%20Finally%20Project%20becomes%20the%20glue%20that%20ties%20all%20tasks%20together%20for%20a%20project%20manager%2C%20which%20is%20sorely%20needed!%20Conversely%20To%20Do%20becomes%20the%20place%20for%20the%20individual%20to%20see%20all%20their%20own%20tasks%2C%20even%20from%20Project.%20Although%20To%20Do%20needs%20some%20work%20too%2C%20in%20that%20department%2C%20but%20that's%20a%20different%20story.%3CBR%20%2F%3E%3CBR%20%2F%3EThis%20took%20me%20about%2040%20minutes%20to%20think%20out%2C%20so%20I%20apologize%20that%20it%20is%20thoroughly%20incomplete%2C%20but%20I%20hope%20it%20will%20help%20inspire%20some%20ideas%20that%20I%20hope%20to%20see%20soon%20in%20Project%20(like%20really%20soon!).%20Thanks%20for%20listening.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2704772%22%20slang%3D%22en-US%22%3ERe%3A%20June%20Project%20Update%20Blog%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2704772%22%20slang%3D%22en-US%22%3E%3CP%3E%22My%20Tasks%22%20in%20Planner%20to%20include%20Project%20For%20Web%20tasks%20and%2For%20Teams%2C%20Tasks%20by%20Planner%20and%20To%20Do%20%26gt%3B%20Assigned%20to%20me%20to%20include%20Project%20for%20Web%20tasks.%20Realise%20that%20I'm%20just%20another%20request%20in%20the%20many%20of%20the%20same%20but%20with%20uservoice%20being%20closed%20want%20to%20ensure%20there%20is%20awareness%20of%20capability%20interest.%3C%2FP%3E%3C%2FLINGO-BODY%3E