Planner: Export your entire plan to Excel for powerful analysis, sharing, and more

Published Jun 24 2019 10:56 AM 221K Views

(Please note - this feature is only currently available in the Planner web app (https://tasks.office.com) and not when using Planner via the SharePoint web part or within Teams)

 

Planner comes with some pretty cool out-of-the-box tools for keeping your team on track. In-app features like red highlights for late tasks and color-coded labels provide visual cues for quickly finding tasks that need attention. There’s also the Charts view, which gives you different visual representations of progress, especially now with charts filtering.

 

But there may be times when the simplicity of these tools—and simplicity is our goal with Planner—isn’t quite enough. For more robust plan options, you can now export your entire plan to Microsoft Excel. From conducting more detailed analysis to sharing your plan’s status, Export to Excel gives you a broad range of additional capabilities for keeping your plan on schedule and your plan’s stakeholders up to date.

 

Exporting your plan to Excel is just a couple clicks away—literally. Within the Planner web app, click the “…” at the top of the screen, then select “Export plan to Excel.” And you’re done. Your plan will automatically download as an Excel file to your machine.

 

select.png

 

The downloaded file includes just about all the details from your plan (e.g., assigned to, start and due dates, description, labels, and more), with each task getting its own row in the spreadsheet. The top of the sheet includes all-up plan information, including plan name, plan ID, and date of export to ensure you’re looking at the latest information.

 

exportoexcel.png

 

There are countless use cases for Export to Excel. Below are just few scenarios to help you get started with this newest Microsoft 365 integration.

 

Archiving: Excel can provide a simple method for archiving your completed plans. Export all your plan details to Excel, store that Excel file somewhere safe (like OneDrive for Business), and purge that plan from Planner to keep your hub clean and organized.

 

Analysis: The use cases here are nearly endless. Choosing from a host of Excel’s analysis tools, you can quickly find outliers in your plan; take inventory of completed tasks, which are hidden by default in Planner; sort and filter based on elements not available with Planner chart filters, like who created the task and the task checklist items; build PivotTables and helpful graphs, like Burndown Charts; and, much, much more. Plus, connecting Excel data to Power BI is easier than ever today, giving you yet another option for visualizing critical plan details.

 

Merging plans: There are almost certainly plans in your hub that are somehow related; maybe they share the same executive team or are part of a multi-year strategic initiative. There’s no way to analyze these plans together in Planner—but you can in Excel. By exporting each plan to Excel individually, and then manually merging those files into a single spreadsheet, you can surface new insights about related plans.

 

Printing: Excel gives you a tabular view of your plan details that may be easier to consume for some as a printed document than a Planner plan board.

 

Sharing: There’s currently no way to give access to only some parts of your Planner plan—someone either has access to all of it or they don’t have access at all. This works fine in most cases, but there may be times when you want to share a plan’s status without also sharing all its minute details. Export to Excel can help you do just that. By bringing your plan into Excel, you can easily delete the columns of information you don’t want to disseminate. This can be particularly useful for giving a high-level plan summary to executives without bogging them down with unnecessarily details (or adding them to yet another plan).

 

These are just a few of our ideas of how Export to Excel can help you get more out of Planner—but we want to hear how you’re using it! Leave us a comment below on your experiences so far. We’re constantly looking for ways to improve features like this one and your input for doing that is crucial. Send us ideas for future integration capabilities or enhancements to current ones, like adding the ability to import items from Excel back into Planner, through our UserVoice site. And keep visiting Tech Community for all the latest Planner news and to engage directly with the Microsoft Planner team.

104 Comments
%3CLINGO-SUB%20id%3D%22lingo-sub-717910%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-717910%22%20slang%3D%22en-US%22%3E%3CP%3EDoes%20this%20also%20mean%20we%20can%20import%20from%20excel%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-717940%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-717940%22%20slang%3D%22en-US%22%3E%3CP%3EGCC%20and%20GCC%20High%20instances%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-717978%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-717978%22%20slang%3D%22en-US%22%3E%3CP%3EPlease%20also%20allow%20import%20from%20Excel%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718002%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718002%22%20slang%3D%22en-US%22%3E%3CP%3EYay!%20Just%20in%20time%20for%20end%20of%20year%20reporting!%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EIs%20there%20an%20easy%20way%20to%20sort%20by%20date%20in%20the%20columns%20in%20Excel%3F%20All%20I%20can%20find%20is%20A%20to%20Z%2C%20and%20it%20lumps%20all%20the%20months%20together%2C%20regardless%20of%20year.%20Some%20Excel%20trick%20I%20don't%20know%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718003%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718003%22%20slang%3D%22en-US%22%3E%3CP%3EI%20can%20find%20the%20export%20option%20in%20the%20web%20version%20of%20Teams%2C%20but%20not%20in%20the%20desktop%20app.%20Does%20it%20appear%20there%20as%20well%20(and%20I'm%20just%20a%20little%20blind)%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718044%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718044%22%20slang%3D%22en-US%22%3E%3CP%3EFinally%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718045%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718045%22%20slang%3D%22en-US%22%3E%3CP%3EIn%20the%20article%20it%20says%20it%20works%20in%20web%20version%20of%20Planner.%20So%20i%20guess%20same%20applies%20to%20Teams%20(only%20in%20web%20version%20of%20Teams).%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718094%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718094%22%20slang%3D%22en-US%22%3E%3CP%3EHmm%2C%20dates%20don't%20come%20in%20to%20excel%20as%20dates.%26nbsp%3B%20Pretty%20simple%20to%20do%20guys!%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAlso%2C%20need%20to%20be%20able%20to%20export%2C%20update%20en%20masse%20and%20re-import.%20that's%20the%20biggest%20challenge%20with%20planner%20today.%26nbsp%3B%20Especially%20the%20ability%20to%20update%20linked%20dates.%26nbsp%3B%20So%20when%20moving%20one%20date%2C%20all%20other%20related%20dates%20move%20appropriately.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718095%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718095%22%20slang%3D%22en-US%22%3E%3CP%3Eworks%20great!%20%26nbsp%3BThank%20you%20Microsoft!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718160%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718160%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%3EThanks!%20That%20is%20definitely%20helpful!%20Could%20you%20please%20add%202%20columns%20in%20Excel%20showing%20the%20latest%20comment%20of%20each%20task%20(if%20any)%20and%20the%20date%20of%20that%20latest%20comment%20(if%20any)%3F%20That%20would%20be%20even%20more%20helpful%20for%20tasks%20progress%20analysis!%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718191%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718191%22%20slang%3D%22en-US%22%3E%3CP%3EWill%20this%20be%20incorporated%20into%20the%20Desktop%20version%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718209%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718209%22%20slang%3D%22en-US%22%3E%3CP%3EFor%20those%20folks%20requesting%20to%20sort%20by%20date%2C%20it's%20pretty%20easy%3A%20just%20select%20all%20your%20data%20(CTRL%2BA)%20and%20in%20the%20Home%20Tab%2C%20Choose%20to%20%22Format%20as%20Table.%22%20This%20auto-filters%20all%20the%20fields%20and%20allows%20you%20to%20sort%20and%2For%20filter%20to%20your%20heart's%20content.%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-left%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F120490i5B0153EE9C823331%2Fimage-size%2Fmedium%3Fv%3D1.0%26amp%3Bpx%3D400%22%20alt%3D%22Format%20as%20Table.png%22%20title%3D%22Format%20as%20Table.png%22%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-caption%22%20onclick%3D%22event.preventDefault()%3B%22%3EFormat%20as%20a%20Table%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-left%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F120489i406CEF06BFB57EA3%2Fimage-size%2Fmedium%3Fv%3D1.0%26amp%3Bpx%3D400%22%20alt%3D%22Dates.png%22%20title%3D%22Dates.png%22%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-caption%22%20onclick%3D%22event.preventDefault()%3B%22%3EDates%20are%20automatically%20formatted%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718212%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718212%22%20slang%3D%22en-US%22%3E%3CP%3EColumn%20Check%20List%20Items%3A%26nbsp%3B%3C%2FP%3E%3CP%3EIs%20it%20possible%20to%20have%20a%20Hard%20Return%20after%20each%20line%20item%20in%20the%20cell%3F%20(Alt%20Enter)%3C%2FP%3E%3CP%3EAdding%20a%20comment%20column%20would%20be%20helpful%20too.%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%20to%20the%20project%20team%20this%20is%20a%20great%20step%20forward.%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718228%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718228%22%20slang%3D%22en-US%22%3E%3CP%3EI%20know%20the%20REST%20API%20already%20supports%20pulling%20the%20plan.%20Is%20there%20any%20way%20I%20can%20pull%20the%20Excel%20export%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718241%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718241%22%20slang%3D%22en-US%22%3E%3CP%3ESimple%2C%20efficient%2C%20good%20for%20me%20!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718257%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718257%22%20slang%3D%22en-US%22%3EVery%20helpful%20new%20feature%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718458%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718458%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F365807%22%20target%3D%22_blank%22%3E%40BillEmco%3C%2FA%3E%2C%3C%2FP%3E%3CP%3EHow%20did%20you%20get%20your%20date%20columns%20in%20your%20screen%20shot%20to%20be%20formatted%20with%20year%20first%3F%20Mine%20display%20as%20Month%2FDay%2FYear%2C%20so%20they%20don't%20sort%20correctly.%20I%20tried%20changing%20the%20format%20of%20the%20cells%20to%20that%20other%20date%20format%2C%20but%20it%20did%20nothing.%20Could%20be%20my%20crummy%20Mac%20version%20of%20the%20program%20though.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718497%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718497%22%20slang%3D%22en-US%22%3E%3CP%3EIt%20doesn't%20appear%20this%20is%20available%20in%20the%20Teams%20desktop%20Application.%20Is%20this%20coming%20in%20a%20future%20update%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718536%22%20slang%3D%22en-US%22%3ERe%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718536%22%20slang%3D%22en-US%22%3E%3CP%3EThis%20is%20great!%20Looking%20forward%20to%20import%20from%20Excel!!!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-717431%22%20slang%3D%22en-US%22%3EPlanner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-717431%22%20slang%3D%22en-US%22%3E%3CP%3EPlanner%20comes%20with%20some%20pretty%20cool%20out-of-the-box%20tools%20for%20keeping%20your%20team%20on%20track.%20In-app%20features%20like%20red%20highlights%20for%20late%20tasks%20and%20%3CA%20href%3D%22https%3A%2F%2Fsupport.office.com%2Farticle%2F767e100d-3888-4b9c-9881-9317c33aa1c6%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3Ecolor-coded%20labels%3C%2FA%3E%20provide%20visual%20cues%20for%20quickly%20finding%20tasks%20that%20need%20attention.%20There%E2%80%99s%20also%20the%20Charts%20view%2C%20which%20gives%20you%20different%20visual%20representations%20of%20progress%2C%20especially%20now%20with%20charts%20filtering.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EBut%20there%20may%20be%20times%20when%20the%20simplicity%20of%20these%20tools%E2%80%94and%20simplicity%20is%20our%20goal%20with%20Planner%E2%80%94isn%E2%80%99t%20quite%20enough.%20For%20more%20robust%20plan%20options%2C%20you%20can%20now%20export%20your%20entire%20plan%20to%20Microsoft%20Excel.%20From%20conducting%20more%20detailed%20analysis%20to%20sharing%20your%20plan%E2%80%99s%20status%2C%20Export%20to%20Excel%20gives%20you%20a%20broad%20range%20of%20additional%20capabilities%20for%20keeping%20your%20plan%20on%20schedule%20and%20your%20plan%E2%80%99s%20stakeholders%20up%20to%20date.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20style%3D%22display%3A%20inline%20!important%3B%20float%3A%20none%3B%20background-color%3A%20%23ffffff%3B%20color%3A%20%23333333%3B%20cursor%3A%20text%3B%20font-family%3A%20inherit%3B%20font-size%3A%2016px%3B%20font-style%3A%20normal%3B%20font-variant%3A%20normal%3B%20font-weight%3A%20300%3B%20letter-spacing%3A%20normal%3B%20line-height%3A%201.7142%3B%20orphans%3A%202%3B%20text-align%3A%20left%3B%20text-decoration%3A%20none%3B%20text-indent%3A%200px%3B%20text-transform%3A%20none%3B%20-webkit-text-stroke-width%3A%200px%3B%20white-space%3A%20normal%3B%20word-spacing%3A%200px%3B%22%3EExporting%20your%20plan%20to%20Excel%20is%20just%20a%20couple%20clicks%20away%E2%80%94literally.%20Within%20the%20Planner%20web%20app%2C%20click%20the%20%E2%80%9C%E2%80%A6%E2%80%9D%20at%20the%20top%20of%20the%20screen%2C%20then%20select%20%E2%80%9CExport%20plan%20to%20Excel.%E2%80%9D%20And%20you%E2%80%99re%20done.%20Your%20plan%20will%20automatically%20download%20as%20an%20Excel%20file%20to%20your%20machine.%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%20style%3D%22text-align%3A%20left%3B%22%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%20style%3D%22text-align%3A%20center%3B%22%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20227px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F120468i0F22F9F7C4FD57CA%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22select.png%22%20title%3D%22select.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%20style%3D%22text-align%3A%20center%3B%22%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%20style%3D%22text-align%3A%20left%3B%22%3EThe%20downloaded%20file%20includes%20just%20about%20all%20the%20details%20from%20your%20plan%20(e.g.%2C%20assigned%20to%2C%20start%20and%20due%20dates%2C%20description%2C%20labels%2C%20and%20more)%2C%20with%20each%20task%20getting%20its%20own%20row%20in%20the%20spreadsheet.%20The%20top%20of%20the%20sheet%20includes%20all-up%20plan%20information%2C%20including%20plan%20name%2C%20plan%20ID%2C%20and%20date%20of%20export%20to%20ensure%20you%E2%80%99re%20looking%20at%20the%20latest%20information.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%20style%3D%22text-align%3A%20center%3B%22%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F120469i131ADFA4BD997E32%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22exportoexcel.png%22%20title%3D%22exportoexcel.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThere%20are%20countless%20use%20cases%20for%20Export%20to%20Excel.%20Below%20are%20just%20few%20scenarios%20to%20help%20you%20get%20started%20with%20this%20newest%20Microsoft%20365%20integration.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3EArchiving%3C%2FSTRONG%3E%3A%20Excel%20can%20provide%20a%20simple%20method%20for%20archiving%20your%20completed%20plans.%20Export%20all%20your%20plan%20details%20to%20Excel%2C%20store%20that%20Excel%20file%20somewhere%20safe%20(like%20OneDrive%20for%20Business)%2C%20and%20purge%20that%20plan%20from%20Planner%20to%20keep%20your%20hub%20clean%20and%20organized.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3EAnalysis%3C%2FSTRONG%3E%3A%20The%20use%20cases%20here%20are%20nearly%20endless.%20Choosing%20from%20a%20host%20of%20Excel%E2%80%99s%20analysis%20tools%2C%20you%20can%20quickly%20find%20outliers%20in%20your%20plan%3B%20take%20inventory%20of%20completed%20tasks%2C%20which%20are%20hidden%20by%20default%20in%20Planner%3B%20sort%20and%20filter%20based%20on%20elements%20not%20available%20with%20Planner%20chart%20filters%2C%20like%20who%20created%20the%20task%20and%20the%20task%20checklist%20items%3B%20build%20PivotTables%20and%20helpful%20graphs%2C%20like%20Burndown%20Charts%3B%20and%2C%20much%2C%20much%20more.%20Plus%2C%20connecting%20Excel%20data%20to%20Power%20BI%20is%20easier%20than%20ever%20today%2C%20giving%20you%20yet%20another%20option%20for%20visualizing%20critical%20plan%20details.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3EMerging%20plans%3C%2FSTRONG%3E%3A%20There%20are%20almost%20certainly%20plans%20in%20your%20hub%20that%20are%20somehow%20related%3B%20maybe%20they%20share%20the%20same%20executive%20team%20or%20are%20part%20of%20a%20multi-year%20strategic%20initiative.%20There%E2%80%99s%20no%20way%20to%20analyze%20these%20plans%20together%20in%20Planner%E2%80%94but%20you%20can%20in%20Excel.%20By%20exporting%20each%20plan%20to%20Excel%20individually%2C%20and%20then%20manually%20merging%20those%20files%20into%20a%20single%20spreadsheet%2C%20you%20can%20surface%20new%20insights%20about%20related%20plans.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3EPrinting%3C%2FSTRONG%3E%3A%20Excel%20gives%20you%20a%20tabular%20view%20of%20your%20plan%20details%20that%20may%20be%20easier%20to%20consume%20for%20some%20as%20a%20printed%20document%20than%20a%20Planner%20plan%20board.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSTRONG%3ESharing%3C%2FSTRONG%3E%3A%20There%E2%80%99s%20currently%20no%20way%20to%20give%20access%20to%20only%20some%20parts%20of%20your%20Planner%20plan%E2%80%94someone%20either%20has%20access%20to%20all%20of%20it%20or%20they%20don%E2%80%99t%20have%20access%20at%20all.%20This%20works%20fine%20in%20most%20cases%2C%20but%20there%20may%20be%20times%20when%20you%20want%20to%20share%20a%20plan%E2%80%99s%20status%20without%20also%20sharing%20all%20its%20minute%20details.%20Export%20to%20Excel%20can%20help%20you%20do%20just%20that.%20By%20bringing%20your%20plan%20into%20Excel%2C%20you%20can%20easily%20delete%20the%20columns%20of%20information%20you%20don%E2%80%99t%20want%20to%20disseminate.%20This%20can%20be%20particularly%20useful%20for%20giving%20a%20high-level%20plan%20summary%20to%20executives%20without%20bogging%20them%20down%20with%20unnecessarily%20details%20(or%20adding%20them%20to%20yet%20another%20plan).%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThese%20are%20just%20a%20few%20of%20our%20ideas%20of%20how%20Export%20to%20Excel%20can%20help%20you%20get%20more%20out%20of%20Planner%E2%80%94but%20we%20want%20to%20hear%20how%20you%E2%80%99re%20using%20it!%20Leave%20us%20a%20comment%20below%20on%20your%20experiences%20so%20far.%20We%E2%80%99re%20constantly%20looking%20for%20ways%20to%20improve%20features%20like%20this%20one%20and%20your%20input%20for%20doing%20that%20is%20crucial.%20Send%20us%20ideas%20for%20future%20integration%20capabilities%20or%20enhancements%20to%20current%20ones%2C%20like%20adding%20the%20ability%20to%20import%20items%20from%20Excel%20back%20into%20Planner%2C%20through%20our%20%3CA%20href%3D%22https%3A%2F%2Fplanner.uservoice.com%2Fforums%2F330525-microsoft-planner-feedback-forum%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3EUserVoice%3C%2FA%3E%20site.%20And%20keep%20visiting%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2FPlanner%2Fct-p%2FPlanner%22%20target%3D%22_blank%22%3ETech%20Community%3C%2FA%3E%20for%20all%20the%20latest%20Planner%20news%20and%20to%20engage%20directly%20with%20the%20Microsoft%20Planner%20team.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-TEASER%20id%3D%22lingo-teaser-717431%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%20style%3D%22display%3A%20inline%20!important%3B%20float%3A%20none%3B%20background-color%3A%20%23ffffff%3B%20color%3A%20%23333333%3B%20cursor%3A%20text%3B%20font-family%3A%20inherit%3B%20font-size%3A%2016px%3B%20font-style%3A%20normal%3B%20font-variant%3A%20normal%3B%20font-weight%3A%20300%3B%20letter-spacing%3A%20normal%3B%20line-height%3A%201.7142%3B%20orphans%3A%202%3B%20text-align%3A%20left%3B%20text-decoration%3A%20none%3B%20text-indent%3A%200px%3B%20text-transform%3A%20none%3B%20-webkit-text-stroke-width%3A%200px%3B%20white-space%3A%20normal%3B%20word-spacing%3A%200px%3B%22%3EExport%20to%20Excel%20gives%20you%20a%20broad%20range%20of%20additional%20capabilities%20for%20keeping%20your%20plan%20on%20schedule%20and%20your%20plan%E2%80%99s%20stakeholders%20up%20to%20date.%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%3CSPAN%20style%3D%22display%3A%20inline%20!important%3B%20float%3A%20none%3B%20background-color%3A%20%23ffffff%3B%20color%3A%20%23333333%3B%20cursor%3A%20text%3B%20font-family%3A%20inherit%3B%20font-size%3A%2016px%3B%20font-style%3A%20normal%3B%20font-variant%3A%20normal%3B%20font-weight%3A%20300%3B%20letter-spacing%3A%20normal%3B%20line-height%3A%201.7142%3B%20orphans%3A%202%3B%20text-align%3A%20left%3B%20text-decoration%3A%20none%3B%20text-indent%3A%200px%3B%20text-transform%3A%20none%3B%20-webkit-text-stroke-width%3A%200px%3B%20white-space%3A%20normal%3B%20word-spacing%3A%200px%3B%22%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F120471i88947E4CA2D65C83%2Fimage-size%2Fmedium%3Fv%3D1.0%26amp%3Bpx%3D400%22%20alt%3D%22exportoexcel.png%22%20title%3D%22exportoexcel.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-TEASER%3E%3CLINGO-SUB%20id%3D%22lingo-sub-718797%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-718797%22%20slang%3D%22en-US%22%3E%3CP%3EThis%20is%20excellent.%26nbsp%3B%20However%20is%20it%20possible%20to%20include%20the%20commentary%20in%20the%20planner%20to%20be%20exported%20to%20excel%20too.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-719100%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-719100%22%20slang%3D%22en-US%22%3E%3CP%3EExport%20to%20Excel%20seems%20to%20me%20like%20a%20workaround%20while%20a%20proper%20reporting%20API%20would%20be%20much%20more%20helpful.%20The%20Graph%20Connect%20Reporting%20API%20looks%20promising.%20I%20hope%20Planner%20will%20be%20a%20part%20of%20it%20soon.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-719137%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-719137%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%3EThank%20you%20for%20adding%20this%20feature!%20%3C%2FSPAN%3E%3CBR%20%2F%3E%3CSPAN%3EI%20have%20a%20first%20feed%20back%2C%20and%20it's%20a%20PRIMARY%20request%20to%20make%20sense%20to%20this%20feature.%20%3C%2FSPAN%3E%3CBR%20%2F%3E%3CSPAN%3EWe%20need%20a%20linked%20file%20(as%20a%20Query)%3B%20not%20a%20static%20file.%20%3C%2FSPAN%3E%3CBR%20%2F%3E%3CSPAN%3EAt%20now%2C%20we%20manage%20tasks%20in%20Planner%2C%20and%20in%20excel%20report%2C%20my%20Resp.%20insert%20Priority%20and%20estimated%20Time%20completion%20in%20two%20column%20out%20of%20planner.%20%3C%2FSPAN%3E%3CBR%20%2F%3E%3CSPAN%3EIt's%20very%20important%20to%20have%20a%20file%20up%20to%20date%20in%20real%20time%20for%20Planner%20extracted%20column!%20%3C%2FSPAN%3E%3CBR%20%2F%3ET%3CSPAN%3Ehank%20you%20in%20advance%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-719512%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-719512%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20team%2C%20excellent%20evolution%20to%20permit%20to%20export%20planner%20activities%20to%20excel%20spreadsheet.%26nbsp%3B%3C%2FP%3E%3CP%3EThis%20will%20give%20us%20condition%20to%20have%20statistics.%3C%2FP%3E%3CP%3EOne%20suggestion%20to%20improve%20the%20planner%20even%20more%20is%20the%20possibility%20to%20insert%20time%20in%20the%20activities.%3C%2FP%3E%3CP%3EWe%20need%20to%20have%20the%20statistics%20to%20know%20how%20long%20time%20we%20spend%20in%20each%20activities%20and%20this%20should%20appear%20in%20the%20exported%20spreadsheet.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-720165%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-720165%22%20slang%3D%22en-US%22%3E%3CP%3EThis%20is%20a%20great%20start!%3C%2FP%3E%3CP%3EPlease%20add%20the%20ability%20to%20export%20all%20of%20the%20comments.%20For%20archiving%20purposes%20all%20of%20the%20comments%20would%20also%20be%20required.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-720636%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-720636%22%20slang%3D%22en-US%22%3ETHANK%20YOU!%20This%20is%20huge!%20However%2C%20could%20you%20please%20please%20please%20add%20the%20comments%20to%20be%20exported%20too%3F%3F%20I%20think%20most%20of%20us%20using%20it%20as%20archiving%20purposes.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-721128%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-721128%22%20slang%3D%22en-US%22%3E%3CP%3EI%20dont%20now%20why%2C%20but%20id%20plan%20and%20id%20task%20is%26nbsp%3Billegible%20text%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CTABLE%3E%3CTBODY%3E%3CTR%3E%3CTD%3EId.%20de%20plan%26nbsp%3B%3C%2FTD%3E%3CTD%3EXgxtR0kcPkWFn5aaxbaLlJcAGu3h%3C%2FTD%3E%3C%2FTR%3E%3C%2FTBODY%3E%3C%2FTABLE%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CTABLE%3E%3CTBODY%3E%3CTR%3E%3CTD%3EId.%20de%20tarea%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E_KEfM8YFdka5BPcitOqX3pcABDv4%3C%2FTD%3E%3C%2FTR%3E%3C%2FTBODY%3E%3C%2FTABLE%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-721944%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-721944%22%20slang%3D%22en-US%22%3E%3CP%3EFor%20automation%20I%20need%20a%20Planner%20connector%20to%20Power%20BI.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-724638%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-724638%22%20slang%3D%22en-US%22%3E%3CP%3EGreat%20thanks%20for%20this%20functionality%26nbsp%3B%3C%2FP%3E%3CP%3EConcerning%20the%20checklist%2C%20what%20is%20the%20extract%20logic%20of%20%C3%A9l%C3%A9ments%20because%20I%20can't%20find%20the%20order%20as%20it%20is%20on%20the%20Task%20in%20Planner%20and%20we%20just%20have%20the%20info%20x%2Fy%20are%20checked%20so%20I%20can't%20summarize%20the%20remaining%20elements%3F%26nbsp%3B%3C%2FP%3E%3CP%3EThank%20you%20in%20advance%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-725311%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-725311%22%20slang%3D%22en-US%22%3E%3CP%3EThis%20is%20an%20excellent%20start!%20Thank%20you!%26nbsp%3B%20To%20give%20this%20complete%20functionality%2C%20please%20add%20the%20ability%20to%20export%20comments%20(at%20least%20the%20most%20recent%20comment).%20Until%20then%2C%20it%20is%20not%20sufficient%20for%20my%20personal%20needs.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-739022%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-739022%22%20slang%3D%22en-US%22%3EI%20have%20all%20task's%20listed%20already%20on%20an%20excel%20spreadsheet%20how%20do%20I%20export%20to%20MS%20Planner%3F%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-739028%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-739028%22%20slang%3D%22en-US%22%3E%3CP%3EAs%20the%20title%20says%2C%20this%20option%20is%20to%20export%20your%20plan%20TO%20excel%2C%20not%20from%20Excel%20to%20plan.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-744803%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-744803%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you%20for%20adding%20the%20feature%20of%20exporting%20to%20Excel%2C%20if%20there%20could%20also%20be%20an%20added%20feature%20to%20include%20in%20the%20task%20description%20for%20level%20of%20importance%20such%20as%20the%20three%20!!!%20symbol%20that%20is%20included%20in%20emails%20or%20simple%20messaging%20applications.%20This%20has%20come%20across%20many%20conversations%20once%20I%20had%20the%20ability%20to%26nbsp%3B%20export.%26nbsp%3B%3C%2FP%3E%3CP%3E!-%20Low%20importance%20-%201%3C%2FP%3E%3CP%3E!!-%20Medium%20%22%22-%202%3C%2FP%3E%3CP%3E!!!-%20High%20%22%22-%203%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-744821%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-744821%22%20slang%3D%22en-US%22%3E%3CP%3EI%20have%20an%20issue%20with%20the%20%22Checklist%20Items%22%20Field.%3C%2FP%3E%3CP%3EIn%20the%20Export%2C%20this%20field%20is%20lost%20for%20a%20consistent%20range%20of%20rows.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3Eexample%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CTABLE%3E%3CTBODY%3E%3CTR%3E%3CTD%3ECompleted%20Checklist%20Items%3C%2FTD%3E%3CTD%3EChecklist%20Items%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E0%2F1%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E0%2F2%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E0%2F2%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E0%2F1%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%3E0%2F2%3C%2FTD%3E%3CTD%3E%26nbsp%3B%3C%2FTD%3E%3C%2FTR%3E%3C%2FTBODY%3E%3C%2FTABLE%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-759097%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-759097%22%20slang%3D%22en-US%22%3E%3CP%3EPlease%20Add%20the%20functionality%20of%26nbsp%3B%3CSTRONG%3EMerging%20plans%20in%20Planner.%26nbsp%3B%3C%2FSTRONG%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-762753%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-762753%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20sequence%20of%20checklist%20items%20is%20wrong.%20Tasks%20should%20be%20listed%20in%20checklist%20items%20column%20in%20the%20same%20sequence%20as%20in%20the%20planner%20app.%20Also%20an%20indicator%20which%20task%20is%20finished%20is%20missing.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-773688%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-773688%22%20slang%3D%22en-US%22%3E%3CP%3EI%20can't%20seem%20to%20locate%20the%26nbsp%3B%3CSPAN%3E%E2%80%9C%E2%80%A6%E2%80%9D%20at%20the%20top%20of%20the%20screen%2C%20then%20select%20%E2%80%9CExport%20plan%20to%20Excel.%E2%80%9D%20I've%20tried%20in%20the%20web%20version%20and%20the%20desktop%20version.%20Am%20I%20missing%20something%3F%20Perhaps%20its%20the%20version%20of%20the%20software%3B%20not%20sure.%20%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%3EPlease%20help.%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-774632%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-774632%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F382189%22%20target%3D%22_blank%22%3E%40M_Parent%3C%2FA%3E%26nbsp%3BYou%20only%20can%20find%20that%20option%20within%20the%20plan%20on%20the%20web%20App%20as%20below%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20811px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F124581i6A84C8DA7AFD569E%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22tempsnip.jpg%22%20title%3D%22tempsnip.jpg%22%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-caption%22%20onclick%3D%22event.preventDefault()%3B%22%3EPlanner%20%5BWeb%20App%5D%20%2F%20Plan%20view%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-774648%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-774648%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F297177%22%20target%3D%22_blank%22%3E%40Aingersoll%3C%2FA%3E%26nbsp%3B%20looking%20for%20a%20solution%20I%20found%20this%20in%20MS%20FLOW%20%5B%E2%86%93%5D%20so%20we%20could%20create%20higher%20level%20plans...%20or%20whatever%20you%20can%20imagine!%3CBR%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20751px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F124582i52ACE6449A936584%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22Capture.JPG%22%20title%3D%22Capture.JPG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-775817%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-775817%22%20slang%3D%22en-US%22%3E%3CP%3EIs%20there%20a%20way%20to%20automate%20the%20export%20from%20planner%20and%20send%20it%20as%20attachment%3F%26nbsp%3B%20Maybe%20using%20microsoft%20flow%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-778893%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-778893%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20export%20is%20missing%20data%20in%20the%20Description%20and%20Checklist%20columns%20for%20some%20records.%26nbsp%3B%20The%20data%20is%20visible%20in%20Planner%20but%20is%20being%20dropped%20in%20the%20export.%26nbsp%3B%20Also%2C%20the%20records%20with%20missing%20data%20is%20different%20each%20time%20I%20run%20the%20export.%26nbsp%3B%20I'm%20using%20the%20data%20to%20create%20dashboards%20in%20Power%20BI%20but%20it's%20useless%20with%20inconsistent%20data%20in%20the%20exports.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-786228%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-786228%22%20slang%3D%22en-US%22%3E%3CP%3EExcited%20about%20this%20feature!%3C%2FP%3E%3CP%3EExport%20was%20something%20we'd%20only%20considered%20after%20we'd%20built%20our%20Planner%20out%20quite%20a%20bit.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EOnly%20question%20we're%20struggling%20with%3B%20during%20that%20export%20process%2C%20how%20can%20you%20include%20a%20reference%20to%20an%20image%2Fattachment%3F%3C%2FP%3E%3CP%3EThe%20image%2Fattachments%20are%20stored%20in%20the%20Shared%20Documents%20section%20of%20the%20SharePoint%20page%2C%20but%20they%20don't%20include%20a%20reference%20to%20the%20Planner%20task%20they%20are%20associated%20with.%3C%2FP%3E%3CP%3EHow%20do%20we%20create%20a%20relationship%20between%20the%20image%20and%20the%20Planner%20task%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-790282%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-790282%22%20slang%3D%22en-US%22%3E%3CP%3EWhen%20will%20this%20be%20available%20to%20GCC%20users%20also%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-801503%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-801503%22%20slang%3D%22en-US%22%3E%3CP%3EWhen%20will%20the%20Planner%20to%20Excel%20export%20issue%20be%20fixed%3F%20Exporting%20to%20Excel%20is%20incomplete%20due%20to%20missing%20Description%20or%20Action%20Steps.%20Confirmed%20%22Show%20on%20Card%22%20is%20checked%20for%20all%20in%20Planner.%20Is%20there%20currently%20a%20workaround%20for%20this%20issue%3F%20Thank%20you.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-802671%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-802671%22%20slang%3D%22en-US%22%3E%3CP%3E%3A(%3C%2Fimg%3E%3C%2FP%3E%3CP%3EIf%20you%20are%20making%20us%20export%20to%20excel%20for%20simple%20tasks%20(like%20finding%20recently%20finished%20tasks)%2C%20at%20least%20spend%20some%20time%20to%20make%20the%20export%20work%20correctly.%20It%20does%20not%20export%20dates%20correctly%2C%20making%20it%20an%20ardous%20task%20simply%20to%20find%20recently%20%22done%22%20tasks.%20I%20must%201)%20export%20to%20excel%2C%202)%20fix%20each%20and%20every%20date%20cell%20so%20its%20recognized%20as%20a%20date%20and%20not%20as%20text.%203)%20apply%20the%20filter%20on%20the%20date%20columns%20I%20want.%20All%20these%20because%20in%20Planner%20the%20%22done%22%20sections%20are%20not%20sorted%20by%20done%20date.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-811396%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-811396%22%20slang%3D%22en-US%22%3E%3CP%3EI%20thought%20it%20worth%20sharing%20one%20of%20our%20MVPs%20blog%20posts%20on%20taking%20the%20export%20to%20Excel%20feature%20a%20step%20further%20-%20with%20a%20Power%20BI%20template%20to%20read%20the%20exported%20plans%20and%20consolidate%20-%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Fapplepark.co.uk%2Fpowerbi-planner-template%2F%22%20target%3D%22_blank%22%20rel%3D%22nofollow%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fapplepark.co.uk%2Fpowerbi-planner-template%2F%3C%2FA%3E%26nbsp%3B%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-814502%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-814502%22%20slang%3D%22en-US%22%3E%3CP%3EDescription%20data%20is%20only%20exported%20for%20some%20tasks.%20Not%20always%20for%20the%20same%20tasks%20so%20there%20is%20also%20no%20logic.%20Sometimes%2010%20out%20of%201000%20tasks%20have%20description%20exported%2C%20sometimes%2030%2C%20...%20Although%20all%201000%20tasks%20have%20a%20description%20filled%20in.%20As%20long%20as%20this%20is%20missing%20it%20is%20not%20usable!%20Can%20you%20fix%20this%3F%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-822964%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-822964%22%20slang%3D%22en-US%22%3E%3CP%3EData%20export%20of%20the%20description%20field%20is%20incomplete%20in%20my%20exports%20to%20Excel.%20Like%20many%20others%20have%20reported%20here%2C%20this%20causes%20an%20incomplete%20data%20view%20that%20makes%20the%20export%20somewhat%20unusable.%20Hoping%20that%20this%20can%20be%20resolved%20soon.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-827025%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-827025%22%20slang%3D%22en-US%22%3E%3CP%3EIs%20there%20a%20possibilty%20to%20have%20the%20comments%20exported%20too%3F%20I%20know%20it's%201%20task%20to%20many%20comments%20but%20without%20the%20comments%20the%20export%20is%20quiet%20empty.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-860529%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-860529%22%20slang%3D%22en-US%22%3E%3CP%3ECan%20we%20have%20a%20flow%20(or%20whatever)%20to%20do%20automatic%20scheduled%20export%20the%20complete%20plan%20to%20excel%20%2C%20please%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-876948%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-876948%22%20slang%3D%22en-US%22%3E%3CP%3EI%20currently%20manage%20multiple%20planners%20and%20would%20like%20to%20be%20able%20to%20export%20all%20of%20them%20to%20Excel%20to%20have%20once%20complete%20look%20of%20all%20of%20my%20programs%2C%20is%20this%20a%20feature%20that%20will%20be%20rolled%20out%20as%20well%3F%26nbsp%3B%20Fingers%20Crossed!%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-881231%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-881231%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20-%20Are%20there%20plans%20to%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E(1)%20Resolve%20the%20checklist%20export%20so%20it%20(a)%20puts%20it%20in%20the%20correct%20sequence%20and%20(b)%20separates%20items%20into%20distinct%20cells%20and%20(c)%20shows%20which%20items%20have%20been%20completed%20and%26nbsp%3B%3C%2FP%3E%3CP%3E(2)%20Provide%20an%20export%20for%20the%20comments%20from%20task%20cards%3C%2FP%3E%3CP%3E(3)%20Sort%20the%20layout%20out%20such%20that%20the%20report%20is%20good%20to%20print%20when%20it%20is%20extracted%20to%20remove%20the%20rework%20element%20of%20the%20end%20user%20-%20resizing%2C%20wrapping%20texts%20%2C%20hiding%20the%20id%20column%20etc%20%3F%3C%2FP%3E%3CP%3E(4)%20Also%20aggregate%20Planner%20extracts%20from%20multiple%20planners%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EEssentially%20agreeing%20with%20requests%20from%20other%20messages%20%2C%20thanks%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-881581%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-881581%22%20slang%3D%22en-US%22%3E%3CP%3EI%20was%20wondering%20if%20it%20would%20be%20possible%20to%20hyperlink%20the%20card%20ID%20(in%20the%20ID%20column)%20such%20that%20it%20would%20lead%20back%20to%20the%20source%20card%3F%20This%20would%20be%20a%20%3CEM%3E%3CSTRONG%3Eworkaround%3C%2FSTRONG%3E%3C%2FEM%3E%20for%20those%20who%20want%20to%20see%20the%20content%20of%20comments%2C%20checklists%2C%20etc.%20and%20might%20help%20alleviate%20some%20of%20the%20concerns%20in%20the%20short%20term.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-892124%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-892124%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you!%20for%20continuing%20to%20develop.%20Also%20helpful%20-%20to%20ID%20%2Fflag%20which%20checklist%20items%20are%20completed%2C%20vs%20those%20still%20open.%26nbsp%3B%3C%2FP%3E%3CP%3EThe%20date%20each%20checklist%20item%20was%20last%20completed%20would%20be%20even%20more%20helpful!%3C%2FP%3E%3CP%3ELooking%20forward%20to%20subtasks%20as%20well.%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-905537%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-905537%22%20slang%3D%22en-US%22%3E%3CP%3EDid%20this%20functionality%20go%20away%3F%3F%3F%26nbsp%3B%20I've%20checked%20in%20both%20my%20web%20version%20and%20program%20version%20and%20do%20not%20have%20the%20%22...%22%20next%20to%20board%20%2F%20charts%20%2F%20schedule.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-905608%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-905608%22%20slang%3D%22en-US%22%3E%3CP%3EIt%20still%20shows%20for%20me%20in%20the%20web-based%20interface%20(in%20Chrome%2C%20if%20that%20matters)%3A%3C%2FP%3E%3CDIV%20class%3D%22mceNonEditable%20lia-copypaste-placeholder%22%3E%26nbsp%3B%3C%2FDIV%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20403px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F136651iD7FFA5984481C325%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%222019-10-10_10-46-54.png%22%20title%3D%222019-10-10_10-46-54.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ENot%20sure%20if%20that%20helps...but%20hope%20it%20does.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-905620%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-905620%22%20slang%3D%22en-US%22%3E%3CP%3EScott0825%20-%20what%20exactly%20do%20you%20mean%20by%20the%20'program%20version'%3F%26nbsp%3B%20In%20Teams%3F%26nbsp%3B%20Or%20mobile%3F%26nbsp%3B%20There%20is%20not%20a%20Planner%20'program'%20for%20the%20PC.%26nbsp%3B%20And%20agree%20with%20Briantoo%20-%20it%20still%20shows%20for%20me.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-905636%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-905636%22%20slang%3D%22en-US%22%3E%3CP%3EI%20should%20have%20said%20teams%20program.%26nbsp%3B%20I%20figured%20it%20out%20-%20you%20can't%20go%20into%20the%20planner%20tab%20within%20teams%2C%20but%20have%20to%20go%20into%20planner.%26nbsp%3B%20Which%20seems%20odd%20that%20I%20can't%20access%20this%20functionality%20from%20planner%20within%20teams.%26nbsp%3B%20Maybe%20that%20can%20be%20added%3F%3F%3F%26nbsp%3B%20Just%20another%20step%20I%20have%20to%20take%20each%20time.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-908132%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-908132%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F137147%22%20target%3D%22_blank%22%3E%40Monika%20Dragulski%3C%2FA%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHi%20Monika%20-%20How%20can%20we%20access%20the%20coment%20sin%20an%20extract%20or%20data%20table.%20Can%20you%20point%20us%20in%20the%20right%20direction%20so%20we%20can%20consider%20using%20Power%20BI%20or%20otherwise%20to%20write%20a%20report%20using%20all%20entries%20on%20the%20task%20card%20%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-909253%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-909253%22%20slang%3D%22en-US%22%3E%3CP%3EPlease%20help%20-%20one%20of%20my%20colleagues%20sees%20the%20ellipsis%20to%20offer%20%22Export%20to%20Excel%22%20but%20I%20don't.%20It%20should%20appear%20next%20to%20Schedule%20I%20believe%20-%20can't%20see%20it%20in%20web%20or%20app%20clients%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F137203i95F18AA383C92FD3%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22no%20ellipsis%20to%20click.png%22%20title%3D%22no%20ellipsis%20to%20click.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CDIV%20class%3D%22mceNonEditable%20lia-copypaste-placeholder%22%3E%26nbsp%3B%3C%2FDIV%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CDIV%20class%3D%22mceNonEditable%20lia-copypaste-placeholder%22%3E%26nbsp%3B%3C%2FDIV%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-909408%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-909408%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Claire%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EIt%20looks%20like%20you're%20trying%20to%20find%20the%20export%20function%20in%20the%20desktop%20app%3B%20it's%20not%20available%20there%20(not%20yet%2C%20anyway--but%20I'm%20hopeful!).%20You%20have%20to%20go%20to%20the%20web%2Fbrowser%20version%20to%20find%20what%20you're%20looking%20for.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EBest%2C%3C%2FP%3E%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-977557%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-977557%22%20slang%3D%22en-US%22%3E%3CP%3EAutomation%20is%20the%20key.%20Flow%20need%20to%20be%20able%20to%20trigger%20this%20or%20scheduler%20would%20be%20useful.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1019925%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1019925%22%20slang%3D%22en-US%22%3E%3CP%3Ebloody%20brilliant!%3C%2FP%3E%3CP%3Ethis%20was%20a%20major%20issue%20for%20using%20planner%20in%20a%20controlled%20organisation%20for%20purposes%20of%20traceability%20and%20archiving.%3C%2FP%3E%3CP%3Ethanks%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1081357%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1081357%22%20slang%3D%22en-US%22%3E%3CP%3EHas%20this%20feature%20been%20removed%3F%20I%20don't%20see%20it%20in%20the%20web%20version%20or%20the%20app.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1081678%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1081678%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F499604%22%20target%3D%22_blank%22%3E%40quiddity%3C%2FA%3E%26nbsp%3Bit%20is%20showing%20up%20fine%20for%20me%20in%20the%20Planner%20web%20app%3A%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F163185iC5479C77E2E508A2%2Fimage-size%2Fmedium%3Fv%3D1.0%26amp%3Bpx%3D400%22%20alt%3D%22clipboard_image_0.png%22%20title%3D%22clipboard_image_0.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1081876%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1081876%22%20slang%3D%22en-US%22%3EThanks%20Brian%20-%20that%20helped.%20I'm%20not%20sure%20what%20I%20wasn't%20seeing%20but%20finally%20got%20it.%20Much%20appreciated.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1123805%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1123805%22%20slang%3D%22en-US%22%3E%3CP%3EPlease%20add%20a%20function%20to%20assign%20numbers%20to%20task.%26nbsp%3B%20This%20is%20helpful%20during%20team%20meetings%20when%20pointing%20out%20certain%20tasks.%26nbsp%3B%20Also%2C%20please%20include%20the%20task%20numbers%20when%20the%20plan%20is%20exported%20to%20Excel.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1131325%22%20slang%3D%22es-ES%22%3ERe%3A%20Planner%3A%20Export%20your%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1131325%22%20slang%3D%22es-ES%22%3E%3CP%3EGood%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EGreat%20that%20export%20planner%20is%20now%20available.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EBut%20the%20EXCEL%20does%20not%20display%20comments%20for%20each%20task.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20think%20it%20would%20be%20more%20interesting%20in%20report%20format%20than%20EXCEL.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1118859%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1118859%22%20slang%3D%22en-US%22%3E%3CP%3ECan%20you%20add%20in%20the%20export%20of%20'comments'%20to%20this%20feature.%20Also%20make%20the%20'Task%20ID'%20column%20or%20the%20'Task%20Name'%20column%20a%20hyperlink%20that%20takes%20the%20user%20directly%20to%20the%20task%20within%20Planner%20if%20they%20click%20on%20it.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2249515%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2249515%22%20slang%3D%22en-US%22%3E%3CP%3EExport%20Date%20format...%20FIX%20IT%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2261927%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2261927%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F1013259%22%20target%3D%22_blank%22%3E%40Prog1%3C%2FA%3ESadly%20yes.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2261949%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2261949%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20Progress%20field%20is%20also%20missing%20in%20Power%20Automate%2C%20but%20is%20available%20in%20the%20spreadsheet.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2261987%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2261987%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F1013259%22%20target%3D%22_blank%22%3E%40Prog1%3C%2FA%3E%26nbsp%3B%2C%20I%20first%20tried%20Nintex%20RPA%20but%20I%20run%20into%20some%20issues.%20Now%2C%20I%20am%20using%20Power%20Automate%20Desktop%20to%20go%20to%20each%20planner%2C%20click%20and%20download%20the%20excel%20reports.%20I%20use%20My%20flows%20to%20schedule%20a%20periodic%20run%20on%20a%20dedicated%20laptop.%20Then%20Power%20BI%20appends%20all%20excel%20files%20and%20feeds%20a%20series%20of%20reports.%26nbsp%3B%20I%20am%20sure%20there%20is%20an%20easier%20way%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2262030%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2262030%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F910653%22%20target%3D%22_blank%22%3E%40AlejandraRdA%3C%2FA%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20will%20have%20to%20try%20out%20the%20Desktop%20version.%20My%20flow%20downloads%20plans%2C%20buckets%2C%20tasks%2C%20and%20checklists%20into%20Excel%20and%20then%20I%20am%20manually%20downloading%20the%20Planner%20exports%20spreadsheets%20and%20integrating%20the%20Progress%20and%20Priority%20fields%20using%20an%20Access%20database.%20Yes%2C%20there%20has%20to%20be%20a%20better%20way!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2272538%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2272538%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20Planner%20team%20have%20been%20reviewing%20some%20Power%20Automate%20updates%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F1013259%22%20target%3D%22_blank%22%3E%40Prog1%3C%2FA%3E%26nbsp%3B%26nbsp%3B-%20also%20needed%20for%20the%20increase%20in%20labels%20from%206%20to%2025%20-%20so%20hopefully%20there%20will%20be%20more%20news%20soon!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2318798%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2318798%22%20slang%3D%22en-US%22%3E%3CP%3ETo%20be%20fair%20this%20article%20is%20misleading%20%22exports%20just%20about%20all%20plan%20data%22%20and%20%22up%20to%20date%20data%22%20is%20just%20plain%20wrong.%20The%20comments%20which%20form%20a%20huge%20integral%20part%20of%20a%20task%20is%20not%20exported.%20So%20the%20title%20should%20read%20%22export%20some%20parts%20to%20excel%22%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1138647%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1138647%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20there%2C%20how%20can%20you%20export%20from%20planner%20to%20excel%20in%20one%20go%20if%20you%20have%20multiple%20planner%20boards%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1226429%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1226429%22%20slang%3D%22en-US%22%3E%3CP%3EWe%20are%20implementing%20manually%20a%20layer%20of%20reporting%20that%20get%20from%20excel%20downloaded%20plan%20and%20with%20powerBI%20aggregate%20data%20and%20construct%20the%20dashboards%20usefull%20for%20detailed%20analisys.%20But%20could%20be%20helpfull%20and%20usefull%20that%20powerBI%20online%20could%20access%20to%20planner's%20DBs%20and%20create%20automatically%20the%20reports.%3C%2FP%3E%3CP%3EIs%20it%20possible%3F%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1308497%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1308497%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20Planner%20Excel%20Extract%20does%20not%20keep%20the%20order%20of%20the%20checklist%20items%20the%20same%20as%20in%20the%20Planner.%20What%20is%20the%20logic%20use%20to%20order%20the%20checklist%20items%20in%20the%20extract.%20Thanks%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1354416%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1354416%22%20slang%3D%22en-US%22%3E%3CP%3EHi%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ECan%20someone%20help%20me%20to%20download%20Planner%20excel%20export%20file%20every%20week%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAs%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1387883%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1387883%22%20slang%3D%22en-US%22%3E%3CP%3EHi%2C%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EStill%20wondering%20if%20there%20are%20ways%20to%20download%20multiple%20planners%20to%20Excel%26nbsp%3B%20vs.%20having%20to%20download%20each%20and%20every%20planner.%26nbsp%3B%20This%20would%20be%20a%20game%20changer.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThank%20you!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1401534%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1401534%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F644958%22%20target%3D%22_blank%22%3E%40aussupport%3C%2FA%3Eyou%20can%20write%20a%20flow%20with%20Power%20Automate%20-%20connectors%20are%20available%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1405742%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1405742%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Lu_Mo_8000%2C%20can%20you%20share%20the%20connectors%20and%20your%20scheduled%20flow%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1418012%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1418012%22%20slang%3D%22en-US%22%3E%3CP%3EThis%20option%20is%20available%20nor%20from%20web%20nor%20from%20app%20.....any%20idea%20%3F%3C%2FP%3E%3CP%3E%3CBR%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22fcnet_0-1590505841342.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F194435i5850DE44899ECA8D%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22fcnet_0-1590505841342.png%22%20alt%3D%22fcnet_0-1590505841342.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22fcnet_0-1590518366706.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F194528i2C97A97FC451E208%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22fcnet_0-1590518366706.png%22%20alt%3D%22fcnet_0-1590518366706.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22fcnet_0-1590518951287.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F194533i7179A4BE04AF4108%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22fcnet_0-1590518951287.png%22%20alt%3D%22fcnet_0-1590518951287.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2746335%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2746335%22%20slang%3D%22en-US%22%3E%3CP%3EI'm%20having%20the%20same%20date%20issue%20as%20mentioned%20several%20times%20here.%26nbsp%3B%20The%20dates%20export%26nbsp%3B%20as%20MM%2FDD%2FYYYY%20-%20which%20is%20useless%20for%20me.%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20want%20to%20use%20pivot%20tables%20in%20Excel%20-%20if%20the%20dates%20were%20formatted%20correctly%20I%20would%20get%20Year%2C%20Qtr%20and%20Month%20drill%20downs.%26nbsp%3B%20Formatting%20the%20cells%20won't%20correct%20the%20issue%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EMy%20Region%20settings%20are%20correct%20in%20Office%20-%20see%20below%2C%26nbsp%3B%20so%20it%20looks%20like%20the%20extract%20routine%20is%20not%20taking%20account%20of%20these%20settings.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EPlease%20fix%20this!%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22Ian_Boylan_0-1631551915612.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F310060i25C6092020F647D4%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22Ian_Boylan_0-1631551915612.png%22%20alt%3D%22Ian_Boylan_0-1631551915612.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1421333%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1421333%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F137147%22%20target%3D%22_blank%22%3E%40Monika%20Dragulski%3C%2FA%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%3CSPAN%3EThis%20is%20ability%20to%20export%20the%20plan%20to%20excel%2C%20is%20fantastic%2C%20except%20that%20it%20creates%20a%20security%20hazard%20when%20we%20have%20GUEST%20users%20on%20the%20plan.%26nbsp%3B%20Is%20there%20a%20way%20to%20prevent%20guest%20users%20from%20exporting%20the%20plan%3F%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1421812%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1421812%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22fcnet_0-1590609833657.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F194851i7F3089EB57D10E3A%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22fcnet_0-1590609833657.png%22%20alt%3D%22fcnet_0-1590609833657.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3Ewhere%20are%20the%20...%20%3F%3F%3F%3C%2FP%3E%3CP%3Enor%20from%20Chrome%2C%20Nor%20from%20Edge%2C%20nor%20from%20IE%20....where%20is%20this%20export%20option%20%3F%20it%20has%20diseapear%20or%20only%20relevant%20to%20some%20tenant%20only%20%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2748431%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2748431%22%20slang%3D%22en-US%22%3E%3CP%3EI%20had%20a%20similar%20problem%20that%20required%20javascript%20to%20figure%20out%2C%20but%20I%20think%20I've%20done%20it%20using%20Excel%20commands%20instead.%3C%2FP%3E%3CP%3EI%20had%20exported%20and%20unhelpful%20columns%20which%20I%20turned%20into%20date%20format%3C%2FP%3E%3CP%3EI%20used%26nbsp%3B%3DDATEVALUE(LEFT(I2%2C2)%20%26amp%3B%20%22%2F%22%20%26amp%3B%20MID(I2%2C4%2C3)%20%26amp%3B%20%22%2F%22%20%26amp%3B%20RIGHT(I2%2C2))%20then%26nbsp%3B%3DDATEVALUE(LEFT(J2%2C2)%20%26amp%3B%20%22%2F%22%20%26amp%3B%20MID(J2%2C4%2C3)%20%26amp%3B%20%22%2F%22%20%26amp%3B%20RIGHT(J2%2C2))%3C%2FP%3E%3CP%3EWhere%20I2%20was%20the%20start%20date%20and%20J2%20the%20finish%20date%2C%20then%20extracting%20the%20text%20appropriately%20I%20shoe-horned%20it%20into%20the%20start2%20and%20finish2%20columns.%3C%2FP%3E%3CP%3EAnd%20it%20worked.%20Below%20is%20the%20graphic%20from%20my%20excel%20file%20and%20examples%20of%20the%20data%20columns%20below%20that.%20The%20colours%20in%20the%20excel%20graphic%20are%20just%20cells%20that%20highlight%20when%20matching%20the%20values%20in%20start2%20or%20finish2%20to%20create%20a%20very%20basic%20gantt.%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20image-alt%3D%22project1.jpg%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F310242iB371DE80F9EA196E%2Fimage-size%2Flarge%3Fv%3Dv2%26amp%3Bpx%3D999%22%20role%3D%22button%22%20title%3D%22project1.jpg%22%20alt%3D%22project1.jpg%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CTABLE%20width%3D%22800%22%3E%3CTBODY%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3EStart%20(column%20I)%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3EFinish%20(column%20J)%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3EStart2%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3EFinish2%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E15%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E30%20Jun%20'22%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E15%2F06%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E30%2F06%2F2022%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E15%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E30%20Jun%20'22%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E15%2F06%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E30%2F06%2F2022%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E15%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E25%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E15%2F06%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E25%2F06%2F2021%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E15%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E25%20Jun%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E15%2F06%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E25%2F06%2F2021%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E05%20Jul%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E16%20Jul%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E05%2F07%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E16%2F07%2F2021%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E19%20Jul%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E15%20Oct%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E19%2F07%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E15%2F10%2F2021%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E09%20Aug%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E09%20Aug%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E09%2F08%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E09%2F08%2F2021%3C%2FTD%3E%3C%2FTR%3E%3CTR%3E%3CTD%20width%3D%2293.9844px%22%20height%3D%2230px%22%3E31%20Aug%20'21%3C%2FTD%3E%3CTD%20width%3D%22109.938px%22%20height%3D%2230px%22%3E31%20Aug%20'21%3C%2FTD%3E%3CTD%20width%3D%22197.516px%22%20height%3D%2230px%22%3E31%2F08%2F2021%3C%2FTD%3E%3CTD%20width%3D%22197.562px%22%20height%3D%2230px%22%3E31%2F08%2F2021%3C%2FTD%3E%3C%2FTR%3E%3C%2FTBODY%3E%3C%2FTABLE%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1421864%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1421864%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F420198%22%20target%3D%22_blank%22%3E%40fcnet%3C%2FA%3E%26nbsp%3B%20it%20looks%20like%20your%20clip%20is%20from%20within%20TEAMS.%26nbsp%3B%20%26nbsp%3B%20Go%20out%20to%20a%20browser%20and%20login%20to%20task.office.com%2Fyourorganization.com%20and%20you%20should%20see%20it.%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22MiguelEgas2020_0-1590611338971.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F194859iA3DDCEC56D41655E%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22MiguelEgas2020_0-1590611338971.png%22%20alt%3D%22MiguelEgas2020_0-1590611338971.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2749160%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2749160%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F462931%22%20target%3D%22_blank%22%3E%40MWDuk%3C%2FA%3E%2C%20thanks%20for%20that!%26nbsp%3B%20I%20did%20it%20slightly%20differently%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3DDATEVALUE(CONCATENATE(MID(H2%2C4%2C3)%2CLEFT(H2%2C3)%2CMID(H2%2C7%2C4)))%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ENow%20if%20I%20could%20link%20tasks%20in%20Planner!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-2749365%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2749365%22%20slang%3D%22en-US%22%3E%3CP%3ESome%20great%20feedback%20here%20-%20and%20don't%20forget%20to%20use%20the%20in-application%20to%20send%20Planner%20feedback%20-%20the%20Program%20Managers%20certainly%20use%20this%20feedback%20to%20prioritize%20new%20features.%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22BrianSmith_0-1631630831919.png%22%20style%3D%22width%3A%20400px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F310318i43A37C122D9849FD%2Fimage-size%2Fmedium%3Fv%3Dv2%26amp%3Bpx%3D400%22%20role%3D%22button%22%20title%3D%22BrianSmith_0-1631630831919.png%22%20alt%3D%22BrianSmith_0-1631630831919.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1423108%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1423108%22%20slang%3D%22en-US%22%3E%3CP%3EFor%20anyone%20missing%20this%20option%2C%20it's%20not%20available%20(for%20me%20at%20least)%20when%20you%20go%20through%20SharePoint%20or%20another%20wrapper.%3C%2FP%3E%3CP%3EIt's%20available%20in%20the%20options%20when%20browsing%20directly%20in%20the%20Planner%20%2C%20try%20heading%20directly%20to%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftasks.office.com%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3Ehttps%3A%2F%2Ftasks.office.com%3C%2FA%3E%26nbsp%3Bthen%20select%20the%20relevant%20Plan%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1423410%22%20slang%3D%22en-US%22%3ERe%3A%20Planner%3A%20Export%20your%20entire%20plan%20to%20Excel%20for%20powerful%20analysis%2C%20sharing%2C%20and%20more%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1423410%22%20slang%3D%22en-US%22%3E%3CP%3EYES%20!!!%20thanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F462931%22%20target%3D%22_blank%22%3E%40MWDuk%3C%2FA%3E%26nbsp%3B%20and%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F659473%22%20target%3D%22_blank%22%3E%40MiguelEgas2020%3C%2FA%3E%26nbsp%3Bthat's%20exactly%20that%20!%20what%20a%20nice%20hided%20feature%20!%20%3A)%3C%2Fimg%3E%20thanks%20for%20this%20feedback%20!%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftasks.office.com%2F%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%22%3Ehttps%3A%2F%2Ftasks.office.com%3C%2FA%3E%3CSPAN%3E%26nbsp%3B%20is%20the%20solution%20!%20incredible%20this%20is%20not%20documented%20in%20the%20paper%20!%20it%20should%20be%20the%20first%20line%20of%20the%20news%20!!%20it's%20quite%20strange%20it%20is%20not%20easy%20to%20get%20it%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E