Forum Discussion

raju narumanchi's avatar
raju narumanchi
Copper Contributor
May 21, 2018

MigrationPermanentException

we are in Hybrid environment while doing the migration from cloud to on-premises its shows as as below    

Error: MigrationPermanentException: Mailbox dumpster size 36.46 GB ‎(39,153,389,259 bytes)‎ exceeds target quota 30 GB ‎(32,212,254,720 bytes)‎. --> Mailbox dumpster size 36.46 GB ‎(39,153,389,259 bytes)‎ exceeds target quota 30 GB ‎(32,212,254,720 bytes)‎.

 

i have checked my on-premises database Storage Lmits as per my knowledge it was not issues with storage limits 

 

I'm Attaching the Storage Limit snap short, please check and let me know may be something wrong 

 

  