Can I set up resource capacity using a field other than Work Hours?
Hi,
Is there way to set resource capacity using a field other than work hours?
For example, I track story points in the "Effort" field. If each resource has an effort capacity of 10 story points each day (50/week), can I use that to set the capacity and monitor it in the Work details side pane?
Thanks in advance
No RepliesBe the first to reply