Hey ScottSchnoll,
I figure if you don't know the answer to this, you'll know who to pass the question on to:
So, a little background: I use the Microsoft 365 message center connector in Power Automate to drops news task into a bucket of a plan. From there I've been manually moving the tasks to buckets for the relevant workload, and if the new task is an update to an existing task, I delete the old task.
With the change to the Power Automate connector for the M365 Message Center (https://admin.microsoft.com/Adminportal/Home?ref=MessageCenter/:/messages/MC229082) so that it updates existing tasks, rather than creating a new task each time an item is updated, is there a way to get the Flow to set a label when a task is updated?
New tasks (i.e. new message center items) can still land in that triage bucket, but if the Power Automate Connector updates an existing task, I'd like it to set a label on the task so that I can easily filter on what has been touched.
There seems to be no output parameters from the Microsoft 365 message center connector that I could feed into a subsequent step in the flow to manipulate the created or updated tasks. Also the Planner connector has no trigger on a task being updated and does not expose the Comments or Last Updated Date as a parameters, so I can't even set up another flow to watch for those changes.
Any thoughts on how I could do this, or do you know who owns the Microsoft 365 message center connector that might be able to help?
Hope you are well,
Martin