Forum Discussion
edd080
Sep 05, 2024Brass Contributor
SCCM 2403 KB29166583 Hotfix
Hello to all after installing the KB29166583 hotfix I am having issues imaging any device through OSD; the device is able to pxe boot and I also arrive up to the point where i can select an image to ...
Shogo
Sep 06, 2024Copper Contributor
For now we have activated a script that is scheduled to run every 10th minute, restarts the sms agent host service on each MP if connections is over 10000 to avoid system halt, i have to evaluate if this limit is enough, we have two MPs so then it can be a total of max 20000 connections.
EDIT: Sep 06 2024
After some days with the above workaround, the services on MPs did restart between every 30-120 minutes, causing some disturbance.
We have now changed to the "replace with old dll"-workaround, and it seems fine, at least after one day, still no official fix from Microsoft.