Forum Discussion

a-foo's avatar
a-foo
Copper Contributor
Aug 24, 2021

Amortized costs in Azure Budgets

Currently Azure budgets can only evaluate actual spend, there is no option to evaluate amortized cost. This results in inaccurate representation of spend when RI's are in play.

 

Does anyone know if this is on the roadmap to be released in Budgets any time soon? In Cost Analysis you can already switch between actual and amortized view but nothing similar in budget configurations yet.

Thanks you!

5 Replies

  • JeffColyer's avatar
    JeffColyer
    Occasional Reader

    Is there a feature request in to add the amortized cost?  I asked through the support channel a while back and I haven't seen anything.

  • tommykneetz's avatar
    tommykneetz
    Iron Contributor
    https://learn.microsoft.com/en-us/azure/cost-management-billing/costs/tutorial-acm-create-budgets#costs-in-budget-evaluations
    • Michael Brandt Lassen's avatar
      Michael Brandt Lassen
      Copper Contributor

      tommykneetz thanks for sharing the link. However, as the linked text says: “Budget cost evaluations are based on actual cost. They don't include amortization.” So I still don't see an opportunity to create budget alerts based on amortized cost, or am I missing something?

       

      • cboehnke's avatar
        cboehnke
        Copper Contributor
        Just wanted to add my voice here. It's June 2023.
        Introduction of Savings Plans and the ability to scope them (and RIs) at the management group level make it even more common for benefits to be applied outside of the billing subscription that made the purchase - making it ever more important to be able to set budgets + alerts based on amortized costs.

        We had to solve this externally - via extra DB and PowerBI.
        That unfortunately takes the ease of setting and seeing budgets in the AZ portal out of our users' hands.

Resources