Velocity widget in Azure Devops | Doesn't calculate based on completed story points
Hi Team, I am fairly new to Azure DevOps as a tool for Agile scrum project tracking. We have been through a few iterations already. And as I am exploring the "Velocity widget", I see that when I ...
Pramod_Peddada
Apr 04, 2022Copper Contributor
Can someone please advise / help on my query?
- Art_BarnwellJun 12, 2024Copper Contributor
Pramod_Peddada Velocity widgets can be configured to calculate in various ways, as follows.
Not sure if this helps (so long ago).
https://learn.microsoft.com/en-us/azure/devops/report/dashboards/team-velocity?view=azure-devops&tabs=in-contextWorkflow state Description
Planned Calculated based on the number of work items assigned to the sprint before the start of the sprint. If a work item is assigned to the sprint before it begins, but gets assigned to another sprint after the start of the original sprint, it shows as Planned in the original sprint. Then, the work item shows as Late or Incomplete in the new sprint that it is assigned to. Completed Calculated based on the number of work items assigned to the sprint before or after the start of the sprint and completed before the end of the sprint. Completed Late Calculated based on the number of work items assigned to the sprint before or after the start of the sprint but completed after the end of the sprint. Incomplete Calculated based on the number of work items assigned to the sprint before or after the start of the sprint and not yet completed.