Please, could you explain why the C option is the correct answer of that question.
You plan to move a distributed on-premises app named App1 to an Azure subscription. After the planned move, App1 will be hosted on several Azure virtual machines. You need to ensure that App1 alway...
ibnmbodji
Feb 03, 2021Steel Contributor
In a planned maintenance when you have 5 update domains 4 are accessible while the 5th is updated and rebooted . So if you have 10 UD 2 vms will be rebooted while 8 will be accessible .
0 1 2 3 4 5 --> 5 is Off
0 1 2 3 4 5 --> 5 is Off
- azzouz180Dec 25, 2021Copper Contributor
Option C clearly specifies that the fault domain is 1. When I try to setup an availability set with a fault domain of 1 in the portal, I get the following message "The update domain count must be 1 when fault domain count is 1." How can the C option be correct then?
- ibnmbodjiDec 26, 2021Steel ContributorDidn't pay attention to "one" so you're right the C is not correct . It means also that there is no correct answer for this question .