Aug 22 2021 01:35 PM - edited Aug 23 2021 01:49 AM
Looking for the formula that will help me to present time difference between current time to status 1 ((Time_Initiated))
If stage 2 or 3 were reached, there is no need to measure.
I want to control the time period for me to be able to trigger actions based on the time between the current moment to the start of the process.