Baseline & Archiving

%3CLINGO-SUB%20id%3D%22lingo-sub-2501009%22%20slang%3D%22en-US%22%3EBaseline%20%26amp%3B%20Archiving%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2501009%22%20slang%3D%22en-US%22%3E%3CP%3EHey%20everyone%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EFor%20a%20large%20project%2C%20we%20use%20Sharepoint%20as%20a%20file%20repository.%20The%20documents%20pass%20through%20different%20milestones.%20These%20milestones%20are%20updated%20in%20a%20column%20called%20%22Baseline%22.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EWe%20want%20to%20be%20able%20to%20generate%20a%20view%20where%20we%20only%20have%20the%20files%20with%20the%20corresponding%20milestone%20label%20(including%20folder%20structure).%20I%20would%20like%20to%20be%20able%20to%20export%20and%20archive%20this%20view%20afterwards.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThe%20challenge%20here%20is%20that%20a%20document%20goes%20through%20several%20milestones.%20The%20current%20version%20maybe%20has%20the%20Milestone-Label%20%2250%25%20Completion%22.%20However%2C%20in%20the%20view%20we%20would%20like%20to%20have%20the%20Version%20of%20the%20Document%20with%20the%20Milestone%20%2225%25%20Completion%22%20from%20an%20earlier%20point%20in%20time.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20am%20very%20curious%20if%20there%20is%20a%20solution%20to%20this.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-2501009%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EDeveloper%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E
Visitor

Hey everyone

 

For a large project, we use Sharepoint as a file repository. The documents pass through different milestones. These milestones are updated in a column called "Baseline".

 

We want to be able to generate a view where we only have the files with the corresponding milestone label (including folder structure). I would like to be able to export and archive this view afterwards.

 

The challenge here is that a document goes through several milestones. The current version maybe has the Milestone-Label "50% Completion". However, in the view we would like to have the Version of the Document with the Milestone "25% Completion" from an earlier point in time.

 

I am very curious if there is a solution to this.

0 Replies