Sep 10 2024 07:34 AM
I have added the screenshot from my project. ofcourse it is an exception that i am defining the tasks in seconds (for example, 0.01 for a task)
1. i am not able to enter anything below 0.01 Hrs. is it the lower limit what can be entered into project ?
2. the 0.01 task duration is shown as 0.02 hrs scheduled duration. this happens only with this particular robot resource based tasks. can some one clarify, where is the error
thanks in advance,
Subash
Sep 10 2024 12:54 PM
Sep 11 2024 12:15 AM
Thanks for the response. But, if you the screenshot i added in the original post, i am able to enter values below 1.4 minutes. so for example i have entered 0.02 and also 0.01. In one case the scheduled duration shows the 0.01 hrs as in task duration and in the second case the scheduled duration is shown as 0.02 instead of the 0.01 task duration.
something is different between the two tasks that i added as screenshot. i checked everything that i could and didnt find any difference